The STAR experiment
Blogs
Events
Help&FAQ
Home
Polls
Sitemap
PWG
Software & Computing
Sub-systems
Council
General
Juniors
Detector Sub-systems
BEMC
BEMC Detector Operator Manual
Calibrations
BPRS
BSMD
Run 3 BTOW Calibration
Run 4 BTOW Calibration
Run 5 BTOW Calibration
Run 6 BTOW Calibration
Run 7 BTOW Calibration
Online Work
First Iteration
Second Iteration
Third Iteration
Fourth Iteration
Fifth Iteration
Seventh Iteration
Run 8 BTOW Calibration (2008)
Database
Mapping
Service Tasks
Software
Useful Documents
DAQ
Detector Upgrades
EEMC
FTPC
HFT
L3
PMD
RICH
Slow Controls
SSD
SVT
TOF
TPC
Trigger Detectors
User login
Username:
*
Password:
*
Create new account
Request new password
Navigation
Recent posts
News aggregator
Popular content
Today's:
2008.09.23 Sided residual plot projection: toward s/b efficency/rejection plot
Software & Computing
2008.09.30 Sided residual: purity, efficiency, and background rejection
All time:
maintenance
Software & Computing
General information
SSH connection stability
STAR Future Physics and Upgrade Planning
Home
»
Detector Sub-systems
»
BEMC
»
Calibrations
»
Run 7 BTOW Calibration
»
Online Work
Seventh Iteration
Submitted by kocolosk on Thu, 2007-04-05 10:02.
Under:
computing
Run 8095073, 600k events.
This summary plot highlights swapped towers in red. As Steve pointed out, we weren't adjusting the HV of these tubes correctly in most of the previous iterations.
‹ Fifth Iteration
up
Run 8 BTOW Calibration (2008) ›
»
Login
or
register
to post comments