Tracking Upgrade Review Material
Submitted by andrewar on Sat, 2006-11-18 20:13.
Under:
The TUP Review is scheduled for Dec. 7th, 2006, and will consist of material from the HFT, IST and HPD groups. The draft charge for the review will be similar to the HFT review charge, archived here: Tracking Review Committee Charge.
The datasets for the upgrade reviews are archived here.
 |
UPGR05 |
| Hit Occupancy |
| Pion Efficiency (pt, &eta) |
| Ghosting (pt, &eta, centrality, pileup) |
| Pion Acceptance |
| Hits X,Y |
| Hit Occupancy |
| Inter-hit distance (r,centrality) |
| Cluster Finding Eff. (centrality) |
| Residuals (r,eta,pt,z,centrality) |
| DCA (pt,centrality,signal) |
 |
UPGR06 |
| Hit Occupancy |
| Pion Efficiency (pt, &eta) |
| Ghosting (pt, &eta, centrality, pileup) |
| Pion Acceptance |
| Hits X,Y |
| Hit Efficiency |
| Inter-hit distance (r,centrality) |
| Cluster Finding Eff. (centrality) |
| Residuals (r,eta,pt,z,centrality) |
| DCA (pt,centrality,signal) |
Study
|
Geometry |
| |
IST(1),HPD,HFT |
IST(1),HFT |
UPGR06 |
UPGR09 |
UPGR10 |
UPGR11 |
| Hit Occupancy |
|
|
|
|
|
|
| Pion Efficiency (pt, eta) |
|
|
|
|
|
|
| Pion Acceptance (pt, eta) |
|
|
|
|
|
|
| Ghosting (pt, eta, centrality, HFT pileup) |
|
|
|
|
|
|
| Hits X,Y |
|
|
* |
* |
* |
* |
| Hit Efficiencies X,Y |
|
|
* |
* |
* |
* |
| Inter-hit distance (r,centrality) |
|
|
|
|
|
|
| Cluster Finding Eff. (centrality) |
|
|
|
|
|
|
| Residuals (r,eta,pt,z,centrality) |
|
|
|
|
|
|
| DCA (pt,centrality,signal) |
|
|
|
|
|
|
Secondary vertex Resolution (D trajectory verctor, phi, centrality) |
|
|
|
|
|
|
|