FTPC MDC4 WRAP-UP

The expected loss at the sector boundaries is less than 5%

Maximum number of hits per track

Number of fitted hits per track

Number of fitted hits vs track length

Acceptance

Transverse momentum distribution integrated over rapidity

Momentum Distribution

Flow analysis is possible

Directed flow from MEVSIM events

Elliptic flow from MEVSIM events

This page was updated by Janet Seyboth on May 14, 2001