Jan 28,2004
**************

5:40 AM started ramping up voltages up to 1000 V

6:50 AM Crate-1 U0 3.0 U1 2.5
crate-3 U0 0.1 U1 0.1 U2 10.8 U3 12.6 U4 7.8 U5 9.2 U6 10.0 U7 8.6
Crate-4 U0 12.2 U1 10.0 U2 10.5 U3 12.5 U4 7.5 U5 8.9 U6 0.3 U7 0.2
7:0 AM Pedestal taken
file : /evp/b/5028001,5028002,5028003_DELETE
To take pedestal ask operator. Take only with PMD ( no other detector)
set base rate 10. Take 100 events.
11:30 Pedestal taken at 1400 volts
File 5028048_DELETE
Pedestal taken at 1000 volts
file 5028051_DELETE
Crate U6,U7 showing high current i.e., 10.8/9.4 Normal 10.0/8.6
3:00 Beam is about to come HV up to 1000 V
Pedestal taken only PMD, L1CTL OUT
Run 5028054 Pedestals high
Taken again
Run 50028055 Ped high not good
HV raised to 1400 V execpt SM 24(1200)
Run started with all other detectors
Run 5028057
16:10 Around 15K events
the current in Crate-3 (U6,U7) is increased to 11.2/9.8 normal(10.0/8.6) and also dead time increased to 96% and also data volume(1500 KB/sec)
So, the Crate is switched off
the deadtime came to 54% and data volume 300KB/sec
HV of SM 22 and 23 reduced to 1350 V
Run 5028058 started
LV crate-3 off Crate-1 & crate-4 on
HV of SM22 and SM23 reducing to 1350
Run started
LV Crate-3 ON
current U6 and U7 10.8/9.3 (normal 10./8.6)
Still high but reduced from 11.2/9.8 A
In between run stopped by Jeff
Run 5028062 running with
HV 1400 SM 13 to SM 21 ; 1350 SM 22 to 23 and 1200 SM 24
LV ON , Crate-1,Crate-3 and Crate-4
Active chains at 1400 V : 37,38,40, 25 to 37 but 25 to 30 not good.
@ 1350 V : 41,42,43,44
@ 1200 V : 45,46,47,48 mixing high voltage
Lots of run started and stopped. Please check the WEB

Run# 5028064 PMD with all detectors HV and LV conditions earlier

17:50 HV and LV conditions as earlier. Runs may not be useful as some
tests are going on. SM 22,23 HV upto 1400 V
LV current in Crate is

0.1,0.1,13.5,13.7,4.8,9.2,10.7,9.3
Very high
on increasing the HV of SM 22 &23 This is bad
lowering down to HV again to 1350 V
After switching off crates and back on again, the current
values became normal (10.7,12.6)
So it is confirmed that SM 22,23 have problems.
It is advised NOT to raise the volatge of these SMs
Runs 5028070-74 may not be useful

21:10
LV on HV 1000 V ( Pedestal voltage)
Pedestal file Run # 5028086
Now raised to operating voltages
SM 13 to 21 1400 V SM 22-23 1350 V SM 24 1200 V
Run 5028093 stopped after 17K events Minbias
Please the LV currents from time to time specially crate-3
U6 & U7 & all.
 

If WIENER CRATE control gets off
How to start ??
start Run
c:/spal/wincrmUSB.exe

**************
JAN 29 2004
**************
04:00 Pedestal taken Run# /evp/b/5029007 at 1000V

08;00 YPV checking LV currents
crate-1 3.0/2.45 screen flashing
crate-3 0.14,0.14,10.76,12.62,7.8,9.2,10.6,9.2
crate-4 12.2,10.0,10.5,12.5,7.4,8.9,0.24,0.24
Checking HV
voltage 1402 1402 1401 1401 1401 1402 1400 1400 1400 1352 1352 1201
current -1.0 0.2 -0.7 0.0 -0.4 -0.3 -0.6 -0.3 -0.7 -0.7 -0.3 -0.7
---green---- ----white---- ---green---- ----green-----
why some values are in white ?
why HV current values are bith +ve and -ve ?
Run 5029019 HV in Pedestal = 1000 V

13:10 Run 5029042 started , first 10K events to be ignored as voltage
was still being raised. In general data seems reasonable.
HV current values -0.400 to -0.800, ok.
Run 5029044 may be good run

Run 5029070 1000 events Pedestal Run 50029071 100 events Pedestal
Full volatge no beam

Run 5029981
Crate-1 failed and dead time went up to 98%-100% and disturbing
others. No way to switch off the Crate-1(Chain 37)
Tried to reduce the HV of SM 18,19 to 1350 V from 1400 V
Still dead time is 98%. Run may not be useful

Run 5029092 started again but same problem of dead time

Run 5029092 PMD taken out

Now Pedestal set to 1000 V for PMD but run is going on for
other detectors
we will take pedestals with Crate-1 failure and take run
if it helps to improve dead time.

Run # 5029093 started Central started will conitue for a long
time.
We have to wait for pedestal and thenwait for operating voltage
and then will see the effect of dead time.
20:00 Run# 5029094 Pedestal for PMD alone
good pedestal Chain # 45,46 showing low no.of channels
HV 1400 V , SM 13 to 21, 1350 V SM 22,23 1200 SM 24
Run 5029100 Minbias started dead time not much taking data @ 80Hz.
May be good run.
Problem may be due to Chain 45 ??
stopped after 30K events for some other problem
approx 1081 pmd evnets from event pool
21:00 Run 5029107 Minbias started again
HV 1400 V , SM 13 to 21, 1350 V SM 22,23 1200 SM 24
may be good run
After 60 K events again PMD 100% dead

Run 5029107 started again
again after 60K PMD 95% dead then 100K out

21:50 Event pool checked Ch# 45 & 46 dead
The dead time increases due to Ch# 45 & 46.
now PMD out
Reducing to pedestal voltage again.
Run may be tried after sometime.
LV off HV pedestal
23:40 CRATE-1 failed

Crate-3 Crate-4
U0 0.14 12.23
U1 0.14 10.13
U2 10.7 7.9
U3 12.62 9.39
U4 7.79 7.41
U5 9.20 8.94
U6 10.48 0.29
U7 8.97 0.24
****************
JAN 30, 2004
****************
00:30 Pedestal taken at 1000V, Chains dead - 25,29,37
Run# /evp/b/5029120_DELETE copied to /data/PEDESTAL/5029120_DELETE
HV 1400 V , SM 13 to 21, 1350 V SM 22,23 1200 SM 24
02:45 PMD entered in the run
Run# 5030006 43K events
Run# 5030007 23K events
Run# 5030011 23K events
Run# 5030012 200K events
Run# 5030018 113K events
Run# 5030019 70K events
Run# 5030020 200K events
Run# 5030021 125K events

Pedestal taken for PMD only @ 1000V
Run 5030022_DELETE

Run 5030029 pedestal at 1100 V with beam BUT LV comes off
Sorry not useful

13:00 Pedestal taken Run # 5030037 and 5030038
HV increased to operating voltage but no production run only Play

Run# 5030045 started Stopped after few events.
Run 5030047 started PMD 100% dead taken out
14:30 Run 5030062 Pedestal with HV @ 1400 , no beam
dead was increased. So HV reduced to
1350V to SM 13 to 22, 1300 V to SM 23 and 1000 V to SM 24
Run 50300101 taken No data seen in online program but PMD
included in the run ??

Run 50300102 started with same configuration above
5030011

22:50 5030115 Pedestal /evp/a/5030115

****************
JAN 31, 2004
****************
LVPS INFO
01:00 CRATE-1 off

Crate-3 Crate-4
U0 0.1 14.0
U1 0.1 13.0
U2 10.7 7.9
U3 12.6 9.4
U4 7.8 7.4
U5 9.2 8.9
U6 10.5 0.3
U7 9.0 0.3
SM 13 to 22 1400 V, SM 22 ,23 1350V and SM 24 1200 V

01:30 Run # # of events
5031002 12 K
3 2K|
4 5K|
7 130K| Prod Min Bias
10 41K|
11 200K|
12 140K
06:00 Pedestal taken 5031013_DELETE
09:55 Run 5031015 started HV same as above
run 5031027 LV off just to see the dead time.
This run is not useful

12:00 SM 15 to 19 HV 1000V and other SMs HV 500V
LV crate-3 off
LV crate-4 on
only chains are 26(B),27(B),28(B),30(B)
SM 31,32,33, 34( after 200 channels) , 35 and 36 o.k.
Pedestal Run 5031028
concentrate only chain corresponding to SM 31,32,33,34,35 and 36.
LV crate 4
U0 12.2 U1 10.2 U2 7.9 U3 9.4 U4 7.4 U5 8.9 U6 0 U7 0

Run 5031034 started
SM 15,16,17,18,19 1400 Volts and all others 500 volts
good run

Run 5031034 with 1425 V of SM15,16,17,18,19 & others are at 500 V
stopped after 27K events good run

Run 5031037 started Mike less events stopped due to beam dump
request

Run 5031038 Pedestal at 1000 V SM 15,16,17,18,19 and others at 500 V
raised to 1400 V. Beam dumped.

Run 5031042_DELETE Pedestal Run @ 1400 V ( SM 15,16,17,18,19)

run 5031046 started HV SM 15,16,17,18,19 1400 V
may be good run stopped after 67 K events.

Now HV = 1425 ( SM 15,16,17,18,19)
run 5031047 started. Stopped after 86 K events.

HV = 1450 V ( SM 15,16,17,18,19)
Run 5031048 started and stopped after 200K events.

HV = 1475 V ( SM 15,16,17,18,19)
Run 5031049 started Run stopped after 30K

reducing the high voltage to 1400 V to SM 15 to 19

Rebooted the daq after the laser run
Run 5031052 started

HV = 1400 V Run 5031055 stopped after 40K events

23:15 Pedestal taken at 1000 V run# 5031061_DELETE

FEB 1 , 2004

00:45 SM 13 to 21 1400 V and SM 22,23 1350 V and SM 24 1000 V

Run # # of events
5031066 42 K
5031067 200 K
5032001 200 K
5032006 200 K
5032007 200 K
008 200 K
009 145 K
5032016 82 K

08:00 LV/HV checked
08:15 PMD SMS
13 14 15 16 17 18 19 20 21 22 23 24
-1403 -1402 -1400 -1401 -1401 -1401 -1399 -1400 -1401 -1351 -1351 -1000
-1.1 -0.4 -0.8 -0.0 -0.4 -0.3 -0.70 -0.4 -0.8 -0.7 -1.0 0.0

Power Supply
 

Crate-3 Crate-4
vol curr vol curr
U0 2.91 0.1 2.88 12.3
U1 2.90 0.1 2.89 10.7
U2 2.90 10.9 3.07 7.9
U3 2.92 12.7 3.07 9.4
U4 2.91 7.8 2.88 7.4
U5 2.91 9.2 2.90 8.9
U6 2.90 10.5 2.89 0.2
U7 2.91 9.0 2.89 0.2

Run# # of events

5032018 192K
5032019 laser run
5032022 200K
5032023 200K
5032025 200K
5032026 48K
5032027 112K
 

11:00 Beam dump PMD standby voltages
**************
01 Feb 2004
**************
1115 Pedestal taken with det at 1000V and NO beam. run no. 5032031.
Volatge raised to 1400V.

12:50 RUN NO. 5032039. Production Run. HV=1400 (SM13-21), HV=1350 (SM22-23);
HV=1000V (SM24).
---
RUN NO. 5032048 .. conf. same as 5032039 Run No.
--Stopped after 175K events due to 100% dead time in PMD
LVPS RESET; Next RUN started...

3:00PM RUN NO 5032049 Started.. Running well...
Stopped after 200K events..

--- RUN NO 5032050 Started .. Running Well with above conf..
 

4:50PM RUN NO. 5032051 -- PEDESTAL RUN at 1400V. No BEAM++++
There is no visible difference in peds with 1000V.
***************
02.Feb.2004
***************
0:40AM: Run #: 5032062 ---PEDESTAL RUN taken at 1400V for all the SMs except
SM24 (1000V)
CRATE-3,4 are ON. Sigma for all the chains are Ok ( within 2-4).

PHYSICS run starts.SM-13 to 21 are @ 1400V,SM-22,23 are @ 1350V,SM24 @ 1000V
Productuin Min Bias.-------********
1:30AM : Run # 5033002 ~ 18K events
2:20AM : Run # 5033003 ~ 200K events
2:40AM : Run # 5033004 ~ 80K events
3:15AM : Run # 5033008 ~ 3700 events

4:20AM : Run # 5033016 ~ 200K events
4:50AM : Run # 5033017 ~ 121K events
5:30AM : Run # 5033022 ~ 108K events
6:00AM : Run # 5033023 ~ 123K events

6:10AM :Beam is dumped....so ramped down the HV to standby mode.

6:35AM :Run#: 5033026 --- PEDESTAL RUN taken for PMD @ 1000Vfor all the SMs

Looks OK. Sigma is low as the previous pedestal run.

08:45 Run# 5033047 PMD shows 90% deadtime and data volume more than
1 mb/sec.
Run# 5033047 was stopped (69K events).
Run# 5033048 started again to see if it works. Deadtime is still
90% and data volume is more than 1 mb/sec, but data taking is
going on. Run was stopped after 120K events.
Daq was rebooted to see if it works to bring down the deadtime
and data volume.
Run# 5044049 started with same condition as above. Still deadtime
is 90% and data volume is more than 1 mb/sec. Sometimes it becomes
as high as 2.5 MB/s.
1030 : run 5033050 : again PMD showed 100% dead and stopped the run with
only about 25K events.

1037 : LV PS switched off and then ON again.
Trying a new run to see if it works.

12:05 : Pedestal taken at 1150V.
Run No.5033063.

15:10 : RUN No. 5033087 : @1400V SM13-21, 1350V : SM21-22; 1000V:SM24;
stopped after 20K events.

---- : RUN No. 5033088 : Conf.. same as above -- 20K events
: Run No. 5033089 : Conf.. same as above -- 20K...
: Run No. 5033090 : Conf.. same as above -- 20K events

: Run No. 5033091 : Conf .. Same as above --
IGNORE 92 and 93 Run No.

PedAsPhysics : RUN No. 5033094; With 1400V., No beam; Equivalent to Pedestal
Run for us.
Pedestal : Run No. 5033095; With 1400V no beam.
Good Pedestal---
**************
03.02.04
**************
-------
PEDESTAL RUN# - 5034003 ---with all the SMs of Preshowerplane at 1000V
and CRATE-3,4 ON

2:10 AM: RUN #: 5034009 ---ProductionMID(Special high pT trigger) ~ 120K
ZDC coincidence rate 4100

2:45 AM: RUN #: 5034011 (first 20K events)
upto above three runs (5034009-11) HV was 1000V.

07:30 am Found that the physics run has started but PMD HV still on
standby (500V)

Run 5033016 not usable.

While ramping up the HV, PMD alarm showed up on the main alarm
console, but there is no alarm window on pmdonline machine and
donot know how to handle this alarm. Ignored.

LV current values :
Ch3- 0.1,0.1, 10.76,12.6, 7.8,9.2, 10.4,8.97
Ch4- 12.2,10.4, 7.8,9.4, 7.4,8.8, .2,.2

HV set (ch 13-21 : 1400V, 22-23 : 1350V, 24 : 1000V)
HV currents (13-24) : -0.4, 0.2, -0.8, 0.0, -0.4, -0.3, -0.1, -0.4,
-0.8, -0.7, -0.3, 0.0
 

0900AM PMD had been taken out of daq as it was giving 100% dead time
and stoping the run.

Did LVPS off/ON.

PMD put back in daq, run 5033029.

analysed about 300 events (230 in PMD), data looks good.
these are stored inpmdonline/PMD2k4/test/feb03/

10:35AM : PMD gets 100% dead time in DAQ. SO kept out from the run.
Recycled the FEE power. May be put in DAQ in the next run.
 

12:19 PM: Got access to connected both crates. So far the indication
is that it didn't work.

2:15PM : After some modification by Tonko,PEDESTAL and PedAsPhy runs
taken with two crates.
PEDESTAL RUN# : 5034042_DELETE
PedAsPhy RUN# : 5034043_DELETE
Seems both the crates working.

7:50PM Testing the DAQ with two crates.

8:05PM : RUN # : 5034109_DELETE PEDESTAL run testing with two CRATES.
RUN # : 5034111_DELETE ProdMinBias : testing with two CRATES.
Looks OK. But there is some problem with token.

******************
04.02.2004
******************
Summary of 12-hr access day.

The day was spent mainly to do the following :

1. Install the LVPS Crate-5 with three channels worning (U2/U3, U4/U5, U6/U7).
2. Debug the chains and connect as much of the CPV part as possible
3. Daq test for two crates together

**************
05.02.2004
**************
08:00 Pedestal taken with 100 events
Run# 5036019

2:30PM : Tonko and Sushantda are working in DAQ to make the TWO crates running.
3:00PM : PEDESTAL run # 5036067_DELETE taken with 2 CRATEs.
Looks OK.
3:10PM : PedAsPhy run# 5036075_DELETE taken with 2 CRATEs about 25K events(557
events in PMD) L1CTL was removed and trigger was issued manually.

There is no beam since since yesterday access.

3:50PM : PEDESTAL run# 5036083_DELETE taken with 2 CRATEs with L1CTL in
with all detector in normal way(issue tirgger at a time).
Pedestal looks OK.

6:30PM : PEDESTAL run# 5036130_DELETE taken (only PMD) at 1000V in both PMD &
CPV.
PedAsPhy run# 5036131_DELETE taken (only PMD) at 1000V in both PMD &
CPV

**************
06.02.2004
*************
7:20AM: Last night PMD was included in the run
Run #: 5036136, 5036138
In these runs both Preshower and CPV were connected
Checked in online: looks OK for PMD plane.

10:10AM:

Tonko checked for PMD run time errors - didn't find any. There was no beam
whole of today to check things out.
 

**************
07.02.2004
*************
4:00 AM: After beam comes back (2:45am) PMD was put in the data stream. Data taking rate was very low. It was taken out.

5038005: Pedestal
5038022: Run couldn't start as PMD shows large error. Rebooted PMD.

5038009: Trigger: Production High: 7K events

5038023: Trigger: Production Mid: 10K events

Data taking rate was about 25Hz and taken out.
 

HV Trip: Super Module number 20 tripped at some point.
I just noticed it now: 5:50am).

6:15am: HV of all good CPV SMs raised to 1400 Volts.

6:30 am: Pedestal taken - many channels didn't show up - run 5038030.
Turn off and on LVPS.
Pedestal taken again. This looks better. But compared to Run 5038005: we find
that: channel 40 doesn't come, channel 34 has a spike, channels 19 and 21
don't come now. What's going on?

1:15PM : There is no beam since 10:30AM. All the SMs are in Standby (1000V).
LVPS current checked. Chain 40 and one of the(18,19,21) may be OFF.

1:35PM: PEDESTAL Run# 5038042 taken for PMD @1000V.
Chain# 40,18,21 doesn't come. Chain-34 has a spike(probably one
board has gone bad) Other chains look OK.

2:35PM : Beam comes(PHYSICS RUNNING). We are not putting PMD into run when
beam is at high rate. Because PMD shows large error.

3:30PM : Only about ~2000 events has been taken without PMD. There was some
problem with DAQ. After few minutes Beam breaks instantly.

6:00PM : Beam is back, we will put PMD in when ZDC coincidence rate will comes
down (~less than 3600). We will not take 'ProductionHigh' trigger events.
PMD is ramping upto operating voltage.

6:45PM : SM(1,2,3,4,7,10,11) of CPV are at 1400V
SM(13 to 23) are @ 1400V and SM24 @ 1000V
CRATE 3,4,5 are ON.

7:00PM : Run #: 5038067 ~ 20K events has been taken for PMD with other
detectors(excluding FTPC).
PMD slows down the rate from (50-60)Hz to (25-30)Hz
From the next run took out PMD from the run.
From the online 2-D as well as ADC plot look chain 39,40 are OFF and
chain-41 gives some junk value.

7:15PM : Putting the PMD in STANDBY mode.

***************
08.02.2004
**************
2:00PM : There was no beam since morning(4:30am). There was some problem in
AGS. Beam came around 2.00PM. PMD ramping upto PHYSICS voltage.
SM(1,2,3,4,7,10,11) of CPV are at 1400V
SM(13 to 23) are @ 1400V and SM24 @ 1000V
CRATE 3,4,5 are ON.
Crate-3 Crate-4 Crate-5
vol curr vol curr curr
U0 2.91 0.1 2.88 12.3 0.0
U1 2.90 0.1 2.89 10.2 0.0
U2 2.90 8.1 3.07 10.1 7.3
U3 2.92 9.5 3.07 12.3 8.6
U4 2.91 7.7 2.88 9.5 8.4
U5 2.91 9.2 2.90 11.6 10.1
U6 2.90 9.3 2.89 6.8 6.8
U7 2.91 8.0 2.89 5.7 5.7

Now ZDC coincidence is high, we will put PMD in run when the 'productionMid'
trigger will be applied.
3:00PM : PMD is in the run.
Run # : 5039037 ---- ~73K events has been taken.

Online Plots checked: Chain-2,3,4,5,6,9 of CPV are OK.
Chain- 25,27,29,30,31,32,33,35,36,37,38,41to 46 are OK.
In some chains there is small peaks at 300 and in some chains there is a
saturation.

'productionLow' trigger applied

3:30PM: Run # : 5039038 ---- ~ 48K events
Run # : 5039039 ---- ~ 30K events
Run # : 5039040 ---- ~ 40K events
Run # : 5039048 ---- ~ 69K events(PMD gives error>5%)
PMD is out of run. Because PMD gives 98.9% errors

6:45PM : PEDESTAL taken Run # : 5039059 @1000V and NO beam
Many chains in Preshower plane are not comming. We will take it again.
 

8PM: We took another pedestal. We noticed that all the channels with
VME Crate 2 didn't appear. We could have rebooted DAQ. Instead we
powercycled pmd01, pmd02 and pmdrps2.
New PEDESTAl looks fine => RUN no. 5039069.
***************
09.02.2004
**************
11:00AM : There was no beam in last night. Beam came at 10:45AM.
Ramping upto PHYSICS voltage.

12:00PM : Run # :5040027 ~ 29,600 evts.

PMD is giving some JUNK in 3-4 chains. So we took out from the run,
Ramp down the voltage to take a PEDESTAL.

PEDESTAL RUN # : 5040029 taken. Chain-39 is giving "JUNK"(mean plot is
completely dark).

12:40PM : PMD include in the run but showing higher dead time with compared to
other detector. We talked to Tanko to mask that CRAM for the time being.

RUN # : 5040035 ~ 49K events
This run is good except chain-39
Took out PMD from the RUN.
2:00PM : Run # 5040040 ~ 5K events
Again Chain-39 is giving lots of JUNK.

There was controled access and Tapan bhai went into and took out the LV
power for Chain-39.

PEDESTAL Run #: 5040060
Pedestal looks OK. Now Chain-9 got OFF(don't kno why?) Otherwise rest of the
chains(whatever it was earlier) are fine.

7:15PM : Run# 5040076 ~ 2500 evts : Again it shows very high dead time.

Again PEDESTAL taken Run# 5040079 Sigma looks a bit high(May be now beam
is there).

RUN # : 5040085 ~ 20K events. PMD had to go out of DAQ as it was giving
large deadtime and slowing down others.
For this run chain#19 was lighting up.
 
 

10:45PM: Run 5040107: Pedestal with BEAM OFF. The pedestal looks fine.

10:51PM: PedasPhys runs give large error, 100% deadtime but doesn't stop.
 

11:12PM: RUN 5040111: Pedestal without Beam and with Full operating voltage.
Problem in running 100% Error.

RUN 5040113: Pedestal running successful after rebooting.

11:27PM: We find that chain#19 is giving large values.
Turning off LV supply to Crate 5 (U6 & U7).
This takes out chains 18,19,20 and 21.
 

Run# 5041001 ~ 3500events taken. PMD gives high dead time.Took out from the run.
************
10.02.04
************

PEDESTAL taken RUN #: 5041044
Ramping upto operating voltage.
10:00AM : PMD included in the run. Trigger 'productionMid'
RUN #5041050 ~ 9K evts.
RUN #5041051 ~ 5K evts.
RUN #5041054 ~ 10K evts.
RUN #5041056 ~ 23K evts.
RUN #5041058 ~ 80K evts.

##########
11:40AM : SLOT-0 - CHANNEL-10 (SM -11) : TRIPPED (Measured current 3.4uA)
Again ramping upto 1400V.
#########

Trigger 'productionLow'
Run # : 5041062 ~ 64K
Run # : 5041063 ~ 6K
Run # : 5041064 ~100K

In the middle of Run # 5041064 we recycled LVPS power of CRATE-3,4,5. WE did this
because the initial few channels (~200) of most of the chains were always firing up
with high rate. After recycling the LVPS the dead time got better.

8:20PM : SM-22 tripped at 1400V.
'productionLow' Trigger

Run # : 5041097 ~ 38K evts.

5041100 ~ 14.5K events.
Took out PMD for these two runs as 15,16,42,44,45,46,47 and 48 are giving lots
of junk.

Run# 5041143 ~ 54K evts. PMD gives higher dead time with compared to other
detector. Took out PMD from the run.

############
Feb 11, 2004
############
00:10 AM: 5041106_DELETE: LV OFF, HV=Standby Voltage at 500 Volts
Chains different from normal: 2,3,4,5,6,15,16,17,18

00:15 AM: 5041107_DELETE: LV OFF, HV OFF
Chains different from normal: 2,3,4,5,6,15,16,17,18

10 AM: No beam Since 7:00AM. Will not be till 7:00PM.
12:00PM : Talk to Tonko for masking two CRATEs.

SEC - 2 - CRAM - 3 ----> Chain 15, 39
SEC - 2 - CRAM - 4 ----> Chain 16, 40

The above two CRAMs has been masked till the next WensDay access.

7:10 PM: PEDESTAL taken in the begining of beam.
RUN # : 5042066 (200 evts) & 5042067 ( 1000 evts)
We found sigma ( ~5-15) this is because of beam ON.
 

'productionMid' Trigger

8:30PM: Run # : 5042078 ~ 72K

'productionLow' Trigger
9:00PM: Run # : 5042082 ~ 80K
From the online plots: Chain25 to 29 is not working.
Since dead time increases so we recycled the LV CRATES in between the run.
Run # 5042082 stopped after 80 K events because of frequently high
dead time of PMD. Few thousand evnets in the begining may not be good
because of recycling of low voltage during the data taking.

10:40 Run # 5042085 ~ 27K
The run started by recycling the low volatge.
Now there is not much problem of dead time of PMD. Rate is
also about 45 Hz as of the previous in which PMD was not included.
Run was stopped after 27188 events.

Run # 5042086 ~ 6880 stopped after 6880 events becase of TOF had 100%
dead time. PMD didnot give any problem.
Run # 5042089 ~ 28K
Run # 5042091 ~ 20K

*************
Feb.12th.04
*************
00:32 AM : PEDESTAL Run# 5042097 .
Pedestal taken @ 1100V and beam was ON. We couldn't take without
beam because beam came to PHYSICS RUNNING within 20 minutes.

'productionLow' trigger applied
10:40AM : Run# 5043037 ~ 25K events

One board has been bypassed from Chain34 (3rd BOARD) during the
controlled access.
12:00 PM: PEDESTAL Run# 5043040 taken looks OK.

13:51: PMD is going to be in the run.
'productionHigh' Trigger

RUN 5043065: 2K events.
RUN 5043069 9K events.
RUN 5043073 ~ 70K events.(Stopped to take pedestal for SVT)

'productionMid' Trigger
RUN 5043075 ~ 119 K events.

'productionLow' Trigger

RUN # 5043078 ~ 101 K full run
RUN # 5043079 ~ 30 K full run
RUN # 5043080 ~ 30 K full run
RUN # 5043081 ~ 50 K full run
RUN # 5043082 ~ 15 K full run

18:00hrs: Now Beam dump.
19:45 Pedestals were taken Run# 5043090, 1000 events.
20:15 Run no. 5043097 was started with PMD in but it had
100% dead time so it was taken out.
Run no. 5043100 was stopped because of 100% dead time
for PMD.

Other detectors also showed 100% dead time. There is
Trigger problem. So data taking is stopped for the
time being.
 

After correcting the trigger problem Run # 5043121 started
including PMD. It was ok and contains 100K events.
Run # 5043122 with PMD in 60K events.
Run # 5043125 started with PMD in. Stopped after 24K events

********* Gives very nice MIP plot (check chain3 ) **********

Run# 5043126 ~ 53K evts
 
 

Feb. 13th 2004
 
Date
Time
Run No.
Comment
Feb. 13,2004 10:00AM 5043129 @1000 Volts and Beam off - loosk fine. During the night PMD gave lots of errors and was out of the run.
11:20 AM 5044046 PEDESTAL, 1000 eents. Taken  at 1000 Volts. Looks fine.
11:45 AM ALL the SMs are at 1400 Volts. 
CPV: 1,2,3,4,7,10,11 
PMD: 13 to 23. SM24 is at 1000 Volts.
12:40 PM 5044066 50K events,
14:00 PMD gave high deadtime when we were out at lunch. It was taken out of run.
14:45 5044079 Production_LOW 33K events
15:00 5044080 9K events (.ps files of ADC for chsins 3,5,26 and 28 are saved)
15:10 5044081 5K events
15:20 Performing Voltage scan for 2 SMs. We are going to increase the voltage of SM4 
(chains 6,7 and 9) and SM14 (chain 26,28). 
Yesterday we were getting nice MIP for chain#3, but today we don't get anything like that. Left side nice shoulder for the MIP doesn't exist now. Yesterday MIP MPV was 54 and today it is coming around 12? What is going on?
15:20 5044084 1K
15:30 Beam Dump
17:15 5044094 
_DELETE
Pedestal Run. Looks OK. It is at 1100 Volts with beam
17:55 50440102 36K, 'productionHigh' trigger. All the SMs are at 1400V. Checked the online plots, peak of each chains in both CPV and PMD planes come about similar value.
6:25PM 5044104 'productionMid' trigger applied. We tried to check the voltage scan of SM-4,14 so wheather we are getting any change in the ADC value. SM-4,14 are @1420V other working modules are at 1400V. 
~ 3K evts. Stopped because of TPC trips.
6:30PM 5044107 ~4K becuae TPC tripped
6:35PM 5044107 ~4K Again TPC  tripped.
5044112 ~60K
5044113 ~17K evts.  'productionLow' trigger applied. We recycled the LVPS (after 15K evts) in between the run because we were not getting much hits in PMD. It didn't help. We found becuase total multiplicity is low so we are getting less hits.
5044118 ~19K evts,SM-4 was 1440V and rest are 1400V
5044119 ~100K events
5044120 ~33K same as above condition
5044123 PEDESTAL taken at 1400V .Looks OK.

 PMD was in the RUN till 12:30AM. Running very nicely with (10-20)% less dead time than TPC.
 
 
 
14.Feb.2004*******In the night (after 12:30AM), PMD was out of RUN. Because always PMD dead time was more than 70%. We had taken Pedestal when beam was dumped. PEDESTAL RUN # -  5044119       was looking fine. But after we leave Shift crews took pedestal taken. While taken pedestal they faced lots of problem, couldn't take pedestal successfully.

 
 
DATE Time Run# # of Events &
Trigger type
Comments
14.Feb.04 10:00AM In the morning PMD was out of RUN. We took the run 'productionLow'  run (PMD only) and online plots checked. PMD is giving lots of junk in the Preshower north side chains. Recycled the LVPS power, CRATE-7,8 ,NIM bins (pmdrps) and pmdrps2. Started a new run with PMD only, but didn't help. 
 Then took pedestal RUN# : 5045036 at 500V and beam was ON. 
 Pedestal looks OK. Started a new run again with 'productionLow' with PMD only @ 500V to make sure that PMD is not giving much junk. Runs fine. Dead time is low(35%).
10:30AM Beam Dumped
11:00AM 5045038 1000 PEDESTAL @ 1400V beam OFF.looks fine.
1:00PM 5045048 ~9K & 
productionHigh
Stooped because of EEMC problem.
1:50PM 5045058 ~36K & 
ProdHigh
Ok
5045059 ~13K 
ProdctionMid
 PMD error was more (not dead time). So took out from the run.
5045062 ~9K 
ProdctionLow
Again PMD is in and looks OK
5045063 93K events 
ProductionLow
  After 80K events dead time of PMD again increased and we recyled the LVPS after the run stops.
5045064 2K PMD dead time is high(65%) wheare as TPC was 35%. Tookout PMD from the run. Probably we have to take pedestal again. Checked the online plots. All the channels of chain 33,34,35,36,37 were firing all the time.
5:00PM Beam Dumped
5:30PM 5045070 1000 evts PEDESTAL run . Plots checked .Looks OK.
6.15PM 5045076 74K 
productionHigh
PMD dead time was sim to TPC dead timeStopped because of BEMC problem. All the channels are always fired of chian-9.
6:50PM 5045077 19K 
production Mid
PMD daq got hanged. Took out PMD from the RUN. May be last 2K events has not been saveed. Chain-9 has similar problem as previous run. We rebooted DAQ & PMD but PMDDaq didn't recover(Stays Red).  So PMD was out of run for next 4 runs. 
Recycled LVPS of CRATE-7,8 and rebooted 'pmdrps2'. PMD DAQ recovered.
7:50PM 5045081 >100K 
productionLow
After doing the above we included PMD in the run. Dead time for PMD is 60% where as TPC is 54%. Stop because TOF dead time was 100%
9:00PM  5045083   18.5 K 
productionLow
TOF  was taken out from the run
 5045085  100K 
productionLow
 
 5045086    11K 
 productionlow
 TOF  included, but again had 100% dead time and run was 
  stopped
5045087   30K 
 productionlow
 TOF was taken out. SVT was also taken out as beam is going 
  to be dump at 10:15 PM.  In PMD , all channels of chain #9     are  being fired in every event. PMD dead time is 
 comparable to TPC.
11:00PM 5045090  1K 
 Pedestal
 Pedsetal taken at 1400 Volts. Chain 3 : mean =228 a6nd Sigma=11
15.02.04 12:30AM 5045096  2K  Dead time of PMD was high so PMD was taken out. All channels of most of the chains are always fired. PMD is out from the RUN. Put HV @ 500V and LV off.

15.Feb.2004
 
 
Time Run # # of Events&
Trigger type
Comments
9:00AM When we came in the morning PMD was out of run and beam was dumped. We checked the online plots of the last run which PMD had taken. We found all the channels of most of the chains are fired. First put LVPS ON and ramped up the HV to 1400V.  Rebooted CRATE-7,8 and recycled the power of 'pmdrps2'.
9:10AM 5046033 PEDESTAL 
1000 evts
PEDESTAL taken. Looks OK.
10:00AM 5046038    39K & 
prodHigh
Pmd runs Ok. Dead time is 10-20% more than TPC. Event rate was very high 85Hz. May be because EEMC was not included in the run.
5046040 4K & 
prodHigh
 OK.  All the channels of Chain-9 is firing all the time. Dead time is similar to TPC
5046041 46K 
prodHigh
OK. All channels of Chain-9 is firing all the time.
5046042 3K 
prodHigh
Super Module -22 (Slot-1,Ch-9) Tripped. PMD gave two times more dead time than TPC. Stoped the run. Ramping up the SM-22 to the operating voltage. PMD was taken out for the next run.
5046044 18K 
prductionMid
Again dead time increased (~ 70%) where as TPC has 40%. Took out PMD from the run. Probably we have to reboot the PMD DAQ and take a pedestal. 
Chain-9 is the problematic one
11:50AM Sm-22 again tripped .Ramping upto 1350V. Afterwards we will operate it at 1350V. Recycled LVPS of Crate-7,8 and 'pmdrps2'. 
12:05PM 5046046 7K 
prodLow
took out PMD after 7K events. Dead time is 70%.(2 times TPC dead time) 
Cahin-9 is giving the problem. 
****set OFF the LV of chain-5,6,7 & 9 CRATE-5(U4,U5). Chain-6,7 were OFF earlier, Chain-9 was giving some junk. Only chain-5 was working in the DB. So we switch OFF the LV of that DB.
2:30PM Beam Dumped.
3:00PM 5046051 1000 evts 
PEDESTAL
Taken at 1400V when beam was OFF. Looks OK. 
3:15PM 5046054 15K 
prodHigh
SM(1,2,3,4,7,10,11)  of CPV are @ 1400V.
SM(13 to 21) and 23 of Preshower plane are @ 1400, SM-22 @ 1350V and SM-24 is at 1000V.
Now dead time has reduced (45%). Looks Ok. Chain-9 doesn't fire any more.
5046059 8K 
prodHigh
dead time is 40% same as TPC. Ok. Running well
5046060 >90K 
prodHigh
dead time 30% similar to TPC. Running well.
5046061 prodMid Running well
5046064 6K 
prodMid
Ok
5046065 50K 
prodLow
OK dead time is (40-50)% similar as TPC
5046066 100K 
prodLow
Similar dead time as above. Ok.
5046067 100K 
prodLow
Ok.
7:30PM 5046068 100K 
productionLow
Ok, Dead time was low(40-50)% similar to TPC.
5046069 15K 
prodLow
OK, READY for beam dumped. During ramping down SM-13 tripped.
8:00PM Beam dumped
8:20PM 5046072 1000 evts 
PEDESTAL
Looks OK.
5046077 ProdHigh  PMD dead time is around 50% , it is twice the TPC. But PMD is included.
  Chain# 3 ADC dist looks good. Chain #  6 & 7 has large low adc chennels
  fired.  Chain # 44 and  46 has large hits with  Gaussian ADC dist with peak
  at 250 ADC. Chain # 45 , 47 and 48 have large number of low adc channels.
5046078   20K 
 ProdMid
 PMD was taken out because of high dead time

16.Feb.2004
 
 
 
TIME RUN# # of evts &
Tirgger
Comments
9:15AM Beam was OFF for last 5 hours. In the last night we couldn't take data because of higher dead time. So, we thought to recycle the LVPS-7,8 and 'pmdrps2' as well. Also recyled the NIM BIN (pmdrps). Then took pedestal at 1400V.
5047022, 
5047026, 
5047027, 
5047028, 
5047055_DELETE
1000K 
PEDESTAL
The mean and sigma plots completely messed up. The similar problem had observed in Chain-25,26,27,28,29,30  15 days back. (See the sample of one chain which has taken today). All the chains(CPV ,Preshower) are giving similar type of Pedestal plots.We susspect CLK or CLR or may be due ot NIM CRATE  problem. We recycled the power of NIM bins several times but no change. PMD is not in the run. 
What we did as suggested by Sushant(check the pedestal by powering LV crates one by one- 
1.We switched OFF the LV CRATES and took pedestal, mean value is 35-45 and sigma is 0.5-0.6 @ 1000V. 
2.Power ON LV crate-3 and took pedestal @ 1000V. Found the same problem as the above link . 
3. Power ON LV crate-4 and 5 one by one, took pedestal @ 1000V and found the same problem. 
 We will dig this problem on Wednesday(18th.Feb) access.
7:30PM There was some in the beam in the morning, data taking was there only for 4 hours. Around 7:30PM TPC gas system had some problem, so data taking had stopped. It started in the morning (17th.Feb)only for 1/2 an hour. 

17th. Feb.2004
 
10:00AM In the 10:00 O'clock meeting, we told our problem about NIM bin. We requested for 1/2 an hour access today. Tonko told he will try for it but chances are less. If we will get controlled access we will bypass the fan in/out module otherwise will be done tomorrow.

18th.Feb.2004
 
 
7:00AM to 4PM We noted a problem with NIM-3 (it was giving -4.3V instead of -6.0V with load). Crate is replaced with another NIM bin which was lying(marked PMD) in the clean room. After changeing we took pedestal and back to NORMAL. 

1.All the chains of Preshower plane has been debugged. We replaced some of the FEE boards which had gone bad and also we adjusted the buffer of some of the chains. 
2. Chain-39 has been connected to SEC-0,BLK-0,CRAM-9 ( starts from 0)
    Chain-40 has been connected to SEC-0,BLK-0,CRAM-10(starts form 0)
These mapping has to be taken care while doing chain mapping. 
signal of Chain-3 has been connected to Fan in/out of NIM-3 (earlier it was connected in NIM-2)

3:30PM 5049020 500 evts 
PEDESTAL
ALL the chains of Preshower plane are OK.
5049026 
_DELETE
100 evts Same as above.  .root files can be found in the follwoing link:

 Feb. 19th,2004
 
 
Time Run # # of evts &
Trigger
Comments
10:30AM 5050026 1000 
PEDESTAL
looks OK. Chain-40 (which has been connected to output-11 ) few(~400) chainnels are good. For chain-46 its OK upto 750 channels. 
SM-20 tripped in between.
5:00PM 5050051 1000 
PEDESTAL
There was no data taking due to beam development till 5PM.Pedestals look OK. SM-20 kept on tripping(if we change made form Phy to pede or ped to Standby). Sometimes the HV window was not comming to the normal ending(like PEDESTAL or Physics successful) 
SM-20 was set to zero volt in Physics setting file.
5050064 10K

Feb. 20th. 2004
 
 
Time Run# # of evts
Trigger
Comments
9:45AM We were unable to take even PEDESTAL (in pedestal PMD dead time was 100%). Discussued with Tonko, he told glink was broken. After consulting with Sushant everything was recycled in the following order:
1. Recycled CRATE-6
2.Recycled CRATE-7,8
3.Recycled Trigger (pmdrps2.starp.bnl.gov)
4.Recycled NIM bin(pmdrps.starp.bnl.gov)
5.Recycled LVPS CRATE(3,4,5)
11:00AM 5051048 PEDESTAL 
500evts
Looks OK, Pedestal taken when Beam ON @ 1400V.
  5051051 ProdMid 
14K
5051055 ProdMinBias 
10K
5051062 ProdMinBias 
1300 evts
5051063 ProdLow 
10K
BAD run (there ws some problem with trigger)
5051064 ProdLow 
10K
 After this run PMD is out from the run because of high dead time.
3:00PM 5051114 

5051115
30K each dead time was high. All the channels were always firing of Chain-1,35,45,46 
with low ADC values. We put SM-1 to 0V (in physics setting file) 
PMD dead time was 20% more than TPC and data rate was reduced 50-40Hz
9:00PM 5051118 10K 
prodLow
dead time was still very high PMD was taken out
10:00PM Recycled everything
1. Recycled CRATE-6
2.Recycled CRATE-7,8
3.Recycled Trigger (pmdrps2.starp.bnl.gov)
4.Recycled NIM bin(pmdrps.starp.bnl.gov)
5.Recycled LVPS CRATE(3,4,5)

Feb. 21st.2004
 
 
Time Run# # of evts
Trigger
Comments
1:00 AM 5051121 500evts 
PEDESTAL
Looks OK.Sigma is high(~8). Pedestal taken when beam ON
5052016 prodLow 
96K
Adc plots look OK. Chain-1 was still firing more. But 35,45,46 improved.
5052017 prodLow 
3K
5052018 prodLow 
23K
5052019 prodLow 
47K
9:45AM 5052038 prodLow 
43K
PMD is running in prodLow. 
5052039 prodLow 
73K
5052042 prodLow 
91K
Ok. after this there was beam dump. We took PMD out of the run before 10minutes of the dump.
12:10PM 5052049 PEDESTAL 
500 evts
Pedestal taken @ 1400V when beam was OFF. Looks OK. RMS values are also small(~1.5)
5052049 PEDESTAL 
1000evts
Similar to above and pedestals are also similar. 
14:30PM 5052069 prodMid 
3K
PMD shows high dead time and high errors. All the channels are being fired in most of the chains. PMD taken out from the run.
3:00PM 5052073 PEDESTAL 
500 evts
Decided to take pedestal when beam ON. Pedestals looks ok, but RMS values are high(~4-5)
5052074 prodMid 
1000evts
PMD gives high error. it is out from the RUN.
3:15PM 5052077 PEDESTAL 
500evts
Recycled Crate-7,8 and recycled Trigger(pmdrps2.starp.bnl.gov) and also recycled LVPS(crate-3,4,5).   Pedestal was taken when beam was ON @ 1400V. Looks Ok, with rms value high(~ 4-5). After all these we put PMD in the run 'prodLow'
5052078 prodLow 
9K
Data looks OK. PMD dead time is 40-45% which is 10% low than TPC.
5052079 15K 
prodLow
OK.Stopped because TOF problem
5052080 17K 
prodLow
Ok,(stopped because of EMC problem)
5052082 46K 
prodLow
Ok,
5052083 41K 
prodLow
Ok,
5:00PM 5052085 11K 
prodLow
Ok, (After this run SM-11 & 21 tripped so we took out PMD from the run and ramping upto operating voltage). After ramping up, there was beam DUMP.
5:30PM 5052090 PEDESTAL 
500 evts
Pedestal taken @ 1400V with beam OFF. Checked the pedestal file. RMS values looks high (~ 8-12). We will take pedestal again.
5052091 PEDESTAL 
500evts
Pedestal taken at the above settings.Pedestal looks OK, sigma comes around (~1.5)
9:45PM Beam is back, we are ramping up our detector to put in prodMid( we are not putting in prodHigh because PMD is giving lots of dead time).
10:45PM No data taking becuase of some problem with TPC. For PMD SM-11 tripped(1400V, 3.4microAmp as shows in the Slow control). We are not ramping up this SM for this run because the chains which are connected to this SM are not working
10:50PM prodMid  We had put the PMD into the run but it's dead time was 78% where as TPC had 30-40% and also data rate reduced a large extend. Took out PMD from the run.
11:10PM 5052115 PEDESTAL 
500 evts
Pedestal taken when beam was ON. Before that we recycled the LVPS(crate-3,4,5) 
Looks OK, But sigma is high(~4-5)
11:20PM 5052117 prodLow 
3K
TOF was 100% dead time. But PMD was 45-50% slightly less than TPC & FTPC
5052118 prodLow 
10K evts
Intially it was OK, but later dead time increased PMD taken out from the run
11:55PM 5052121 PEDESTAL 
500 evts
Recycled Crate-7,8 and also Trigger crate (pmdrps2) and LVPS(crate-3,4,5). Pedestal taken @ 1400V with beam ON. Now the rms value are low(~1.5) as in the case of beam off, but the channel to channel to variation of rms values within the chain are large.

Feb.22nd 2004
 
1.05AM 5052122 prodLow 
86K
PMD has 40-50% dead time similar to TPC. Going well. 
At the end PMD dead time was high. We checked all the channels of most of the chains are firing(after 75K events). Beam dumped.
5053046 PEDESTAL 
500 evts
Pedestal taken @ 500Vwhen beam was ON
5053053 prodLow 
47K
This run was taken @ 500V 
5053056 prodLow 
55K
Taken @ 1000V for all SMs
5053057 prodLow 
22K
taken @ 1000V for all SMs
5053059 prodLow 
46K
taken @ 1400V
4:00PM 5053087 prodMid High dead time, taken out from the run
5053089 PEDESTAL 
500 evts
Recycled the power of LVPS crates, Crate-7,8 and Trgger crate(pmdrps2).
Pedestal taken @1400V and beam was ON. 
5053091 prodLow 
28K
After recycling the power now its running well. Dead time is 40-50% (less than TPC). We are observing that when ever we are putting into the run we have to recycle everything. Probably there is problem with our DAQ(don't know!!) SM- 20 is @ 0V since last two days.
5053094 prodLow 
100K
running well. After that there will be beam dump. So we took out from the run.
9:30PM 5053107 PEDESTAL 
500evts
Recycled all CRATE-7,8 and pmdrps2. Pedestal taken @ 1400V when beam was ON , looks OK, sigma is high(5-10) but channel to channel variation of sigma is high.
11:00PM 5053113 prodMid 
42K
@500V, SM-20 is OFF
11:30PM 5053115 prodMid 
50K
@1000V 

23 Feb. 2004
 
Time Run# # of evts
Trigger
Comments
00:05AM 5053118 prodLow 
72K
OK,
00:35AM 5053119 prodLow 
97K
OK, we handed over to shift crew and asked them to put PMD in prodMid and ProdLow(not in prodHigh) without taking pedestal further.
5054008 prodMid 
80K
5054012 prodMid 
49K
5054013 prodMid 
72K
5054020 prodLow 
127K
5054024 prodLow 
100K
9:21AM 5054048 prodLow 
49K
5054051 prodLow 
116K
12:00PM 5054056 PEDESTAL 
500 evts
PEDESTAL  taken @ 1400V when beam was OFF. Without recycling CRATE-7,8
2:20PM 5054074 prodMid 
35K
5054076 prodMinBias 
28K
5054078 prodLow 
50K
5054079 prodLow 
9K
5054080 prodMinBias 
10K
5054081 prodMinBias 
4K
4:00PM 5054082 prodLow 
66K
all @ 1400V except SM-20 is OFF in Preshower plane. dead time is 45-50%
5054083 prodLow 
77K
5054084 prodLow 
47K
Increased the voltage of SM-3 to 1425V to study the Chain-3. 
Status of HV of all SMs:
2,3,4,7,10,11 are @ 1400V rest SMs are 0. Only Chain-3,5 is working in CVP plane
SM-13,14,15,16,17,18,19,21,23 are @ 1400V and SM-22 @ 1350V, SM-24 is @ 1000V,SM-20 is @ 0V
5054086 prodLow 
16K
all the channels of most of the chains are firing all the time. Dead time incresed upto 65-70%. We checked online Data is not good. Beam dumped
5054088 PEDESTAL 
500evts
Recycled Crate-7,8 and pmdrps2 .Then took pedestal, pedestal not good, Sigma of first few of channels for all the Chains are Zero and after that Sigma goes upto 15-20. So we took pedestal again.
5:45PM 5054089 PEDESTAL 
500 evts
Looks OK, Pedestal taken @ 1400V with beam OFF . We are raising SM-3 to 1425Vto study Chain3. We will put PMD in prodMid
7:35PM 5054100 prodMid 
98K
Running with similar dead time with TPC & FTPC (55-65)%
5054101 prodMid 
49K
5054103 prodLow 
98K
5054104 prodLow 
26K
5054105 prodLow 
98K
PMD dead time was high(70%) at the end part of the RUN. Dead time was 2times high with compared to TPC & FTPC and also reducing the data rate.
10:15PM 5054106 prodLow 
732 evts
PMD dead time very high. PMD is out from the run. After few minutes there will be BEAM DUMP. SM-3 was @ 1425V
10:55PM 5054108 PEDESTAL 
500 evts
Pedestal taken @ 1400V. Beam is back very soon. So while taking pedestal bema entered into the ring. Pedestal looks OK, Ramping up the SM-3 to 1450V to check chain3. SM-1 @ 0V

24th Feb. 2004
 
Time Run# # of evts
Trigger
Comments
00:30AM 5054115 prodMid 
62K
PMD dead time (60-70)%is high with compared to other detectors. Checked in Online, all the channels of chain25 and 27 are firing all the time. SM-3 is at 1450V & SM-1 @ 0V
00:55AM 5054116 prodMid 
44K
We have incrased SM-3 to 1475V to study chain-3 , since all the channels of chain25 & 27 were firing all the time, so we put SM-13 to 0V. SM-20 is also at 0V. There is some major problem with this module, now a days its tripping even at 500V.
1:25AM 5055002 prodLow 
123K
SM3 increased to 1500V to study chain-3, SM-1 @ 0V rest condtions are same as above. Dead time is similar to TPC
2:10AM 5055003 prodLow 
98K
same as above conditions. Ok,. SM3 @ 1500V
2:55AM 5055006 prodLow 
98K
Same as above, OK. SM3 @ 1500V 
3:30AM PMD is in the prodMid run and runnin well, we handed over to Shift crew.
9:30AM PMD was in run in the night. It continued upto 12:30PM. After that there is beam dump.
1:30 PM 5055050 Pedsestals 
500 Events 
 @ 1400 volts when beam OFF
5:05PM Till now there is no beam
9:30PM 5055095 prodHigh 
100K
Beam came, we are putting PMD in the run all SMs are @ 0V dead time is less (25%)
10:40PM 5055097 prodMid 
67K
All SMs are @ 500V, except SM-20 @ 0V. Sm-20 has some major problem, it is not taking even 500V, 
We checked the first few events in online. We didn't get ADC distribution but after 30K events we checked and found the lots of background in the ADC distribution. We took out PMD from the RUN to raise the voltage to 1425V. 
11:00PM SM-14,15,16,17,18,19,21,23 are @ 1425V,SM-22 @ 1350V, SM-24 @ 1000V, SM-13,20 are @ 0V----Preshower plane 
SM-1,3 @ 1425V, SM-2,4,7,10,11 @ 1400V, SM-5,6,8,9,12 @ 500V
11:35PM 5055100 prodLow 
100K
 All the SMs are @ above configuration. Running fine. Dead time 50-60 % similar to TPC and FTPC. The following chains are working in preshower plane now: 
26,27,28,29,32,34,35,39,41,42,44,45,46,47 in preshower plane and Chain-3 in CPV plane. These are chains working in last 5 days.
5055101 prodLow 
67K
SM-21 tripped, Because of the trip Crate-3 got OFF. Data checked in online. Data for this RUN may not be good. HV setting were same as above.

25th Feb. 2004
 
 
Time Run# # of evts
Trigger
Comments
00:40AM 5055105 PEDESTAL 
500 evts
Recycled LVPS crates(3,4,5), Crate-7,8 and pmdrps2. Pedestal taken @ 1400V looks OK but the sigma values are about 5-10 and channel to channel sigma variation are large. Now all the SMs are @1400V (the SMs which were at 1425V
1:00AM 5055106 
35K
prodLow Running well , Online plots looks OK. Dead time is 40-50% similar to TPC. 
 There will be beam dump in @ 1:30AM, now we are handing over to Shift crew for the over night. Tomorrow there will not be any Physics run because there will be beam study.
8:35 PM  5056050 prodHigh  Bad run for PMD, every thing  was off.
9:00 PM  SMs 14 to 19, 23  are at 1425 Volts, SM 21 @ 1400 , SM 22 @1375, SM 24 @1000 , SM 13 & 20(Chain-25 is giving lots of Junk and SM-20 is tripping within 500V) @ 0 and SM 3 of CPV @ 1425,  rest of the chains in CPV are off. Recycled crates 7 & 8 and PMD trigger (pmdrps2).
9:30 PM 5056052 Pedestals 
500 events
SMs at voltages mentioned above. Chains working : 26,27,28,29,32,34,35,38 
39(pedestals high mean 600),40,41,42,44,45(half),46(half),47,48 and chain no. 3 on CPV. 
9:45 PM 5056055 ProdMid 
28K
 Every thing looks ok online. 10-20 % less dead time than TPC.
5056056 prodMid 
87K
5056057 prodLow 
98K
5056058 prodLow 
98K

26th Feb. 2004
 
Time Run# #of evts
Trigger
Comments
1:00AM 5056063 PEDESTAL 
500evts
Pedestal taken when beam was OFF @ 1425V with similar configuration as mentioned in Run#- 5056052 . Looks OK. Sigma is low.
5057034 ProdLow 
100K
SMs are at voltages as mentioned in run # 5056063.
5057036 ProdLow 
68K
 Voltages are same as above.
9:45AM 5057038 ProdLow 
20K
ADC distribution looks ok online.
11:15AM   Magnet is being rampdown to half field ( 0.25 T) , subsequent runs will be at half field. 
5057048  ProdHalfHigh 
 4K
PMD included , PMD dead time was little less than that of TPC dead time. 
 Stopped to fix proper trigger for Minbias
5057049 ProdHalfHigh 
10K
 ADC distributions looks ok. 
Stopped to fix proper trigger for MInbias. Taking out high tower trigger.
5057050 ProdHalfHigh  ADC distributions looks ok. PMD dead time is on par with TPC dead time 
(~50%).
5:00PM SM-14 to 19,23 are @ 1425V, SM-21@ 1400V, SM-22@ 1375V,SM-24 @ 1000V, SM-13,20 are @ 0V in Preshower plane and SM-3 is @ 1425V in CPV.
5:30PM 5057078 PEDESTAL 
500 evts
Pedestal taken @ 1425V as the above configuration with beam OFF. Pedestal Looks OK. The working chains are same as run# 5056063.
Feb. 27,04
 10:00AM
5058010 
5058011 
5058014
ProdHalfLow 
95K 
95K 
26K
5058021 45K
5058022  17K
5058023 100K
5058026 11K
5058027 25K
5058028 83K
5058029 100K
5058030 100K
5058031 100K
11:45AM 5058032 88K ADC disributions looks ok.
12:15 PM 5058035 Pedestals 
500 Events
 SMs which were @ 1425 volts has been raised to 1435 volts. Pedestals look ok. Beam was off.
6:15 PM 5058057 ProdHalfHigh  SM4 tripped at 1400volts. 
PMD dead time was 3 times the other detectors, so PMD was taken out
 We looked online, almost all channels were fired in the following chains 
 1,11,25,26,27,29,32,33,34,37,38,41,45,46,47&48.
6:30 PM 5058059 Pedestals 
500 Events
 Recycling PMD trigger system (pmdraps2) and crate 7&8. 
  Pesdestals look ok. But Chain no. 3 went off. Following chains are working 
 26,27,28,29,32,34,35,(half),38,40,41,42,44,45,(half),46(half),47 &48. Note 
 some of the SM are below 1435 volts as mentioned above (run # 5057078).
7:00 PM 5058060 ProdHalfHigh 
54K
 PMD is in the run. Online looks ok.
7:15PM 5058062 ProdHalfLow 
11K
5058065 ProdHalfLow 
100K
5058066 prodHalfLow 
100K
5058067 prodHalfLow 
100K
5058068 prodhalfLow 
90K
11:00PM 5058070 PEDESTAL 
500 evts
Pedestal taken @ 1435V with beam OFF. We checked, Sigma values were very high (15-20) and also sigma for first (~300) channels were zero. SO, we took pedestal again.
11:05PM 5058071 PEDESTAL 
500evts
Looks OK, sigma is (1.5-2). The number of working chains are same as run# 5058059. All the SMs are at the smae voltage as mentioned above except SM-22 is @ 1400V which was @ 1375V earlier

 Feb. 28th 2004
 
00:05AM Beam is back, we will include PMD in the run
03:30 AM Trip in PMD SM #20. (TT)
8:30 AM 5059022 Recycled the PMD trigger (pmdrps2) and crate  7&8. Online looks ok and  PMD dead is comparable to TPC dead time.
9:35  AM 5059025 Pedestals 
500 Events
Pedestals taken with beam off. Chain 35 (up to 400 channels good). Other 
channels are  same as before(Run# 5058059).
6:00PM Gas cylinder changed.
5059038 prodHalfLow 
12K
PMD dead time was very high (~90%) with compared to TPC (~40%). Online data also seems Bad.
9:30PM 5059047 PEDESTAL 
500 evts
Recycled Crate-7,8 and Trigger crate (pmdrps2).Pedestal taken @ 1435V with Beam ON. Looks OK. Similar number of chains are working as Run# 5058059
5058048 prodHalfHigh 
6K
Online plots checked. Look OK.

29th Feb. 2004
 
 
10:45AM In the night PMD was out of the run. But in the earliy morning PMD was in the RUN(PMD dead time was more). We recycled Crate-7,8 and Trigger Crate(pmdrps2). 
SM-HV: 
In Preshower: SM-14 to 19 & 23 -- 1435V 
                           SM-22 ----------------1410V (Earlier it tripped once @ 1400V now getting conditioned @ 1410V) 
                           SM-21 ----------------1400V ( Tripping after 1400V) 
                            SM-24 ----------------1000V (not completely debugged) 
                           SM-13-------------0V  ( All the channels of Chain25(though it is OFF) firing all the time which causes higher deadtime, so we made HV = 0V) 
                          SM-20 ------------ 0V (Now it is not taking more than 500V) 
Problems to be debugged on the 3rd March access day.
12:02PM 5060038 pedestal 
500events
Taken with beam ON. RMS high
5060043 prodHalfLow 
96K
5060044 prodHalfLow 
96K
5060046 prodHalfLow 
100K
5060047 prodHalfLow 
100K
5060048 prodHalfLow 
100K
5060049 prodHalfLow 
54K
5060050
5060055 Pedestal 
500 evts
Pedestal taken at 1435V with beam ON. RMS is very high(20-40).
5060058 prodHalfLow Data may not be GOOD. For comments see next row.
5060060 prodHalfLow Online plots checked and found most of the chains are not comming. This may be because of very high sigma value in Pedestal. Data of this run may not be GOOD. So, we will take pedestal again.
5060061 PEDESTAL 
500evts
Pedestal taken @ 1435V with beam ON. Sigma is (2-4). Looks OK.
5060063 prodHalfHigh 
50K
5060064 prodHalfLow 
100K
5060065 prodHalfLow 
100K
5060066 prodHalfLow 
23K
9:30PM 5060068 PEDESTAL 
500evts
Recycled Crate-7,8 and Trigger crate(pmdrps2). Pedestal taken @ 1425V (now onwards we will run @ 1425V, because Chain-3,34 got OFF))when beam was OFF. Pedestals look OK, sigma is (1.5-3). The SMs which were at 1435V are reduced to 1425V,rest of the  HV configuration is same.
5060074 prodHalfLow 
100K
5060076 prodHalfLow 
100K
5060077 prodHalfLow 
96K
5060078 prodHalfLow 
50K
5060080 prodHalfLow 
15K
1stMar 2004
5061005 PEDESTAL
5061009 100K
5061010 100K
5061012 60K
5061013 200K
8:45AM 5061026 PEDESTAL
5061031 48K
5061032 17K
5061034 100K
5061035 8K
5061036 140K
5061040 7K
5061044 200K
5061045 95K
14:30PM 5061049 PEDESTAL 
500 evts
taken without beam. looks O.K
5061059 105K
5061060 100K
5061064 100K
5061067 100K
7:30PM 5061068 ProdHalfLow 
37K
PMD dead time became high towards the end of the run( may be good upto 25K)
5061070 Pedestals 
500 evts
Recycled PMD  VME crates. Pedestals taken with beam on and looks ok.
5061071 83K
8:30PM 5061075 Pedestals 
500evts
Pedestals taken with beam off at operating voltage and look ok.
10:00PM SM-21 tripped @ 1400V, set it operating voltage, PMD is not in the begining of the run.
10:15PM 5061086 prodHalfLow PMD dead time was more than 94%. Taken out from the RUN and took the pedestal with beam ON.
10:45PM 5061087 PEDESTAL 
500evts
Recylced Crate-7,8 and pmdrps2. Pedestal taken @ operating voltage beam ON. 
5061088 44K Running well,
5661090 100K
5661091 100K
5661092 34K
5661093 12K
5661094 70K
MARCH 2
8:30 AM 5062004 Pedestals 
500 evts
 taken with beam on.
5062009 93K
5062009 100K  Data looks ok.
5062010 39K
5052015 4K PMD dead time was very high, so stopped the run.  Also beam lost. HV 
window lost. Connection reset. Recycled crates 6,7& 8 and pmdrps2. Now 
SMs which were at 1425 V are set to 1400 V.
3:00PM 5062026 26K SM-22 tripped at 1400V. Took out PMD from the run. Reset SM-22 to 1400V and SM-24 to 1200V
3:35PM We tried to take pedestal but couldn't take. Recycled Crate-3,4,5,6,7,8 and NIM-1,5,6, and pmdrps2.
4:00PM 5062032 PEDESTAL 
500evts
Pedestal taken @ 1400V with bean ON.

March 3,2004
 
10:00PM 5063119 Pedestals 
500 evts
looks ok. Pedestals taken at 1400 V with beam off.

 March 4, 2004
 
 
5064010 ProdMinBias 
53K
Improved coverage of PMD  after  the access. All working SMs are set to 1400V.
5064011 ProdMinBias 
2K
5064012 4K ProdLow
5064019 8K
5064020 4K
5064021 8K
5064039 ProdMinBias 
51 K
5064040 22K
5064041 17K
5064043 96K
5064044 ProdLow 
1.5K
5064045 ProdMinBias 
26K
5064082 ProdLow 
81K
5064085 10K
5064086 13k
5064103 Pesdestals 
500 evts
Looks ok.
5064104 ProdHigh 
4K
5064105 100K
5064106 45K
5064110 ProdMid 
93K
5064111 100K
5064112 19K
5064114 13K
5064117 ProdLow 
9K

 March 5,2004
 
 
5065008 Pedestals 
500 evts
5065037 Pedestals 
500 evts
With beam. Looks ok
5065046 ProdHigh 
17 K
May not be good because of low voltage went off to some of the chains as mentioned
below
5065047 ProdHigh 
21K
May not be good as mentioned above.
5:30 PM 5065060 Pedestals 
500 evts
Pedestals for Chain nos. 25,26,27,28,30,31 & 40 were not ok.  Pedestals were again 
taken
5065068 Pedestals 
500 evts
Currents corresponding to the low voltage channels were observed to be low(off).
May be due to tripping off above mentioned channels.
5065072 Pedestals 
500 evts
Pedestals taken after recycling the low voltage crates 3,4 & 5. Now Pedestals look
ok.
5065073 ProdHigh 
39K
Looks ok online execpt chain no. 31.
5065074 ProdMid 
51K
5065077 ProdLow 
100K
 
5065078 ProdLow 
63K
5065079 115065ProdLow 
46K
PMD dead time increased to 100%. So PMD was taken out. 
In the beginning run looked ok but in the end adc distributions of all 
chains confined to low adc values and after sometime dead time increased to 
100%.
5065084 ProdLow 
93 K
Recycled crates 7 &8 and pmdrps2.  adc distributions looked ok  in the beginning. PMD dead time (70%)  almost doubled the TPC dead time after 35 K events and adc distributions also were not ok. Many chains had many channels fired with low adc value.
11:00PM 5065096 Pedestals 
500 evts
Taken with beam on. Looks ok.
5065097 ProdHigh 
11K
5065098 ProdHigh 
30K
looks ok but Chain no. 44 and 45 have many channels fired with low adc values.
5065099 ProdHigh 
9.5K
5065100 ProdHigh 
13K

 March6,2004
 
 
 
 
5066007 Pedestals 
500 evts
5066014 ProdHigh 
84K
5066017 Pedestals 
500 evts
Taken again as PMD was tripped
5066019 ProdMid 
100K
5066020 ProdLow 
17K
5066022 ProdLow 
59K
5066023 ProdLow 
100K
5066024 ProdLow 
3.7K
5066033 Pedestals 
500 evts
5066034 ProdHigh 
17K
Looks ok but chain no. 46 has many channels fired with low adc values. Now 
Chain nos. 44 and 45 look ok.
5066037 ProdHigh 
9K
5066039 ProdHigh 
4.8 K
5066044 ProdHigh 
1.6k
5066045 ProdLow 
91K
No L3 trigger
5066046 ProdLow 
4.8 K
No L3 trigger
9:45 AM 5066047 ProdLow 
97K
No L3 trigger
5066050 ProdLow 
7.8K
9:32 PM  5066078 PMD pedestal 
500 evts
9:54 PM 5066080 Prod High 
35K
no L3
5066081 Prod High 
36K
all det.
5066083 Prod High 
20K
5066084 ProdMid 
56K
5066085 Prod  Mid 
54K
5066086 Prod Mid 
61K
all det no L3
5066088 Prod Low 
59K
5066092 Prod Low 
85K
L3 crash
5066094 Prod Low 
100K

March7,2004
 
 
 
1:39 AM 5067001 Prod Low 
25K
5067012 Prod Low 
21K
2:52 AM 5067008 PMD pedestal 
500 evts
5067013 Prod High 
54K
 no L3
5067014 Prod High 
40K
 no L3
4:41 AM 5067017 Prod Mid 
20K
 L3 included
5067018 Prod Mid 
56K
5067019 Prod Low 
62K
5067022 Prod Low 
97K
5067023 Prod Low 
69K
 PMD ramped down for beam dump
5067038 Prod High 
45K
 No L3, ZDC coinc~7700
5067041 Prod High 
50K
 No L3
5067043 Prod Mid 
48K
  L3 is in
5067045 Prod Mid 
38K
5067046 Prod Low 
62K
5067054 PMD pedestal 
500 evts
5067056 Prod High 
3K
 with L3
5067057  Prod High 
7K
 L3 in
5067058  Prod High 
16K
 L3 in
5067059  Prod High 
12K
 
5067060  Prod Mid 
 26K
 ZDC=3600 to test L3
5067061  Prod High 
 4K
 FTPC 100% dead time, DAQ stopped many mins.
5067062  Prod High 
 6K
 L3 in
5067063  Prod Mid 
 96K
 including L3
4:57 PM 5067064  Prod Mid 
12K
 all det.
5067065 Prod High 
2 K 
 with L3, ZDC coinc~2500
5067066 Prod Low 
 18K
 beam dump, cryo problems
5067104  Prod Low 
21K
 no calorimeters
5067105  Prod central 
 18K
 no FTPC
5067107  Prod central 
 68K
 no FTPC, no Barrel, no Endcap
March8,2004 5067108  ProdMin 
100K
 no calorimeters
5067109  Prod Min 
 37K
 no calorimeters, no FTPCs
5068014 PMD pedestal 
500 evts
5068017  Prod High 
7K
 with L3 and all EMC in,run ends with TPC trip
5068018 Prod high 
3K
 100% dead time 
3:09AM 5068019 ProdHigh 
50K
End run due to low beam rate (ZDCand ~ 4K) and go to productionMid triggermix. 

              [comment: one CTB slat tripped during run and was promptly turned on again. Mike is assuming 
              that this is negligible effect, especially for this triggermix, and did not stop run.] 

5068021 ProdMid 
87K
5068022 ProdLow 
100K
5068023 ProdLow 
98K
5068028 PMD pedestal 
500 evts
5068029 Prod Central 
1K
run stopped because rate was slow. Perhaps it is due to L3 being in at high ZDC
5068030 ProdCentral 
13K
5068031 ProdHigh 
37K
Run ends due to low, 'jumpy' event rate. Again suspect L3, so end run to take it out
5068034 ProdHigh 
50K
5068035 Prod Mid 
80K
Find PMD has some HV and some FEE red. (shift log comment)
5068041 ProdMid 
2K
low ZDC rate
5068042 ProdLow 
23K
10:56AM 5068043 ProdMin 
79K
8:38PM 5068132 Prod Central 
43K
5068133 Prod Central 
16K
5068136 ProdLow 
30K
Run stopped due to scheduled beam dump. 
5068142 PMD pedestals 
500evts
5068150 ProdMid 
100K
5068151 ProdHigh 
67K
March9,2004 5069001 Prod Low 
4K
5069002 Prod Low 
202K
5069009 ProdHigh 
3500evts
Run started hanging after 3500 events. Take TOF out
5069010 ProdHigh 
20K
5069011 ProdMid 
127K
5069012 ProdMid 
81K
5069014 ProdLow 
260K
all det in.
5069015 ProdLow 
16K
All det in. Brahms and Phenix requested beam dumped
7:25AM 5069023 ProdHigh 
10K
Run stuck with svt 100% busy. (PMD in now)
5069024 ProdHigh 
6K
PMD causing problems.
5069027 PMD pedestal 
500 evts
with L3, PMD in, but TOF still out (no pedestals yet). It looks as 
  though continuing beam steering at other IR's has reduced beam 
   loss rate, so maybe ZDC coinc. rate loss will reduce.
5069028 ProdLow 
91K
5069031 ProdLow 
100K
 All but fpd in.
5069032 Prod Low 
52K
PMD needs the crates to be recycled and now we will do that
9:30AM 5069034 PMD pedestal 
500evts
6:36 PM 5069075 PMD pedestal 
500evts
5069084 PMD pedestal 
500evts
9.00PM while taking pedestals shift crew found that one crates need recycle and so PMD out till next runs.
March10,2004  5070033 PMD pedestal 
500evts
 Crates recycled and PMD is OK now.
10:44AM 5070036 Prod Mid 
100K
5070037 Prod Low 
52K
5070060 PMD pedestal 
500evts
now all working chains in PMD plane  are at -1400V except in SM 24 we have increased till -1300V as its taking that voltage, rest all same as before. earlier SM 24 had -1200V. SM 20 OFF from 29th Feb as per record.
5070061 Prod High 
42K
5070064 ProdMid 
97K
4:13PM 5070065 ProdMid 
97K
5070066 ProdLow 
100K
5070067 ProdLow 
100K
5070068 ProdLow 
100K
5070069 ProdLow 
100K
5070070 ProdLow 
82K
5070077 PMD pedestal 
500evts
5070079 ProdMid 
68K
5070081 ProdMid 
56K
5070082 ProdLow 
100K
10:32PM 5070084 ProdLow 
100K
 all det.
5070085 ProdLow 
100K
5070086 ProdLow 
100K
5070087 ProdLow 
51K
March11,2004 5071010 ProdMid 
100K
4:46AM 5071011 ProdLow 
5K
5071012 ProdLow 
289K
5071013 ProdLow 
54K
Beam tuning is ON till 7PM so no data.
5071047 PMD pedestal 
500 evts
All working chains except SM 24 are at -1400V.
SM 24 was raised for more than a day at -1300V and chain
47 seems to have gone bad.
8:14PM 5071050 ProdHigh 
40K
no SVT
5071051 ProdHigh 
43K
5071052 ProdMid 
38K
5071053 ProdMid 
100K
5071054 ProdLow 
77K
5071058 ProdLow 
100K
5071059 ProdLow 
94K
Run stopped due to scheduled beam dump
5071068 PMD pedestals 
500evts
 HV same as above.
5071070 ProdHigh 
96K
5071071 ProdHigh 
44K
5071072 ProdHigh 
578evts
5071073 ProdHigh 
39K
 All det stopped as beam lost.
March12,2004 5072009 ProdMid 
159K
7:30AM 5072010 ProdLow 
5K
5072012 ProdLow 
107K
PMD trip. Continue with PMD out of DAQ, while we
              reset trip. 
5072016 ProdLow 
939evts
5072019 ProdLow 
12K
dump warning
10:55AM 5072027 PMD pedestal 
500evts
one more chain seems bad in SM 24 i.e chain 48.So SM -24 now set at -1200V. All other working chains in PMD plane is at -1400V.
5072028 ProdHigh 
42K
5072029 ProdHigh 
97K
5072032 ProdMid 
97K
5072034 ProdMid 
51K
5072035 ProdLow 
100K
5072036 ProdLow 
34K
1:53PM 5072037 ProdLow 
34K
beam is quenched suddenly and so many trips on TPC and FTPC.
7:00PM RHIC MAGNET POWER SUPPLY PROBLEM-No beam!
5072070 PMD pedestal 
500evts
HV conditions same as mentioned above.
5072072 ProdHigh 
5K
5072073 ProdHigh 
100K
March13,2004 5073001 ProdMid 
200K
5073003 ProdLow 
10K
All det. in. 
2:44AM 5073004 ProdLow 
10K
5073005 ProdLow 
50K
5073006 ProdLow 
20K
5073012 PMD pedestal 
500evts
Same HV conditions.
5073013 ProdMid 
100K
5073014 ProdLow 
200K
5073015 ProdLow 
15K
5073016 ProdLow 
16K
5073022 PMD pedestal 
500evts
Same HV conditions
5073023 ProdHigh 
55K
5073024 ProdMid 
186K
5073036 PMD pedestal 
500evts
5073037 ProdHigh 
100K
5073039 ProdMid 
125K
5073040 ProdLow 
200K
5073041 ProdLow 
183K
5073042 ProdLow 
170K
5073049 PMD pedestal 
500evts
6:50PM 5073050 ProdHigh 
40K
All det.
5073051 ProdHigh 
71K
5073052 ProdMid 
172K
5073054 ProdLow 
84K
5073055 ProdLow 
200K
5073056 ProdLow 
92K
March14,2004 5074009 PMD pedestal 
500evts
5:09AM 5074010 ProdHigh 
80K
5074011 ProdMid 
2K
5074012 ProdMid 
200K
5074014 ProdLow 
84K
5074015 ProdLow 
200K
5074016 ProdLow 
105K
5074017 ProdLow 
80K
5074024 PMD pedestal 
500evts
5074025 ProdHigh 
30K
5074026 ProdMid 
100K
5074028 ProdMid 
52K
5074029 ProdLow 
200K
5074030 ProdLow 
200K
3:22PM 5074031 ProdLow 
136K
5074041 PMD pedestal 
500evts
5074042 ProdHigh 
78K
5074044 ProdHigh 
4K
5074050 PMD pedestal 
500evts
5074051 ProdHigh 
43K
Run stopped because we noticed that 
              *** SVT was at pedestals *** 
5074052 ProdHigh 
82K
5074054 ProdMid 
100K
5074055 ProdLow 
100K
5074056 ProdLow 
100K
5074057 ProdLow 
7K
5074072 PMD pedestal 
500evts
HV same as above.
March15,2004 5075038 PMD pedestal 
500evts
5075044 ProdHigh 
10K
 without BEMC,BSMD
5075046 ProdHigh 
32K
 same cond.
5075048 ProdHigh 
28K
5075051 ProdHigh 
28K
5075052 ProdMid 
100K
 All det. in.
5075053 ProdMid 
100K
10:00AM 5075055 ProdLow 
148K
During Run SM-23 tripped and so that should be noted.
Later its ramped up after the run.
 Unexpected beam dump, run stopped. Tandem to booster problem.
5075066 PMD pedestal 
500 evts
5075067 ProdHigh 
73K
5075069 ProdMid 
108K
5075070 ProdLow 
41K
5075071 ProdLow 
58K
5075088 PMD pedestal 
500 evts
5075089 ProdHigh 
100K
5075090 ProdMid 
100K
5075093 ProdLow 
100K
5075094 ProdLow 
100K
5075095 ProdLow 
32K
5075096 ProdLow 
100K
5075097 ProdLow 
100K
5075098 ProdLow 
67K
5075104 PMD pedestal 
500evts
March16,2004 5076018 ProdLow 
48K
5076019 ProdLow 
200K
5076021 ProdLow 
138K
5076022 ProdLow 
68K
5076029 PMD pedestal 
500evts
HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5076030 ProdCentral 
163K
5076032 ProdMid 
165K
5076033 ProdLow 
58K
5076034 ProdLow 
107K
5076048 ProdHigh 
97K
5076049 ProdHigh 
55K
5076061 ProdMinBias 
96K
 ZERO FIELD
5076062 ProdMinBias 
96K
ZERO FIELD
5076069 PMD pedestal 
500evts
 same HV conditions as above
5076070 ProdLow 
20k
5076083 PMD pedestal 
500evts
same HV state
5076084 ProdHigh 
37K
5076085 ProdMid 
4K
Marked as BAD by shift leader
5076086 ProdMid 
87K
BAD run as per Shift Leader
5076093 ProdLow 
errors stopped
BAD run
7PM 5076094 ProdLow 
97K
5076095 ProdLow 
97K
5076096 ProdLow 
78K
March17,2004   ACCESS DAY AND SO NO BEAM AND NO RUNS AT ALL
March18,2004 5078011 PMD pedestal 
500evts
5078023 PMD pedestal 
500evts
5078024 ProdMid 
43K
marked questionable by shift leader
5078027 ProdMid 
1K
Run Crash
5078029 ProdMid 
1K
 questionable by shift leader
5078030 ProdLow 
83K
TOF out
5078033 ProdLow 
41K
5078034 ProdLow 
8K
questionable by shift leader
5078060 PMD pedestal 
500evts
5078061 PMD pedestal 
500evts
Due to change in operating voltage retook peds
5078076 PMD pedestal 
500evts
5078077 ProdMid 
44K
questionable by shift leader
5078078 ProdMid 
97K
5078079 ProdLow 
38K
5078080 ProdLow 
45K
5078082 ProdLow 
200K
5078083 ProdLow 
38K
SVT errors
March19,2004 5079001 ProdLow 
20K
5079003 ProdLow 
30K
5079004 ProdLow 
50K
5079009 PMD pedestal 
500evts
5079012 ProdHigh 
153K
5079014 ProdMid 
122K
2.7% PMD errors
5079015 ProdLow 
33K
5079016 ProdLow 
81K
5079025 PMD pedestal 
1K evts
 We revised to 1K evts form now on for better statistics and also shift leaders wanted as other detectors took 1K evts.
5079026 ProdHigh 
35K
5079027 ProdMid 
94K
After 10 o' clock meeting where we were informed that Controlled access is possible Sub-da took
controlled access and took out Chain 47&48 from Sec-1,Blk-1,Crams-11&12 .
Also CPV Chain 1& 3 are presently connected . Rest ALL CPV chains were taken out of CRAMS as we suspected after discussion (with VECC people) that they maybe contributing to the dead time of PMD.
5079030 ProdLow 
79K
5079032 ProdLow 
6K
SVT errors
5079034 ProdLow 
2K
5079043 PMD  pedestal 
1K
PMD BEAM OFF PEDESTAL TAKEN  AS WE WANTED TO STUDY THE 
PEDESTAL SUBTRACTED DATA AND DEAD TIME --- subhasis & debasish
(http://www.star.bnl.gov/STAR/pmd/ped_on_off)
5079047 ProdHigh 
673evts
 DAQ ERRORS AS BEAM OFF PEDS TAKEN and PMD TAKEN OUT( later this files has been analysed and the above weblink shows the plots  with bump!) 98evts in this run
5079050 ProdMid
1K
ALSO BAD RUN WITH DEAD TIME AND SO CRATE AND NIM RECYCLED
5079054 PMD pedestal 
1K
NOW BEAM ON PEDESTAL TAKEN AND DEAD TIME LOW!
5079056 ProdLow 
100K
5079057 ProdLow 
100K
5079058 ProdLow 
100K
5079059 ProdLow 
200K
5079060 ProdLow 
100K
5079063 PMD pedestal 
1K
5079068 PMD pedestal 
1K
5079069 ProdHigh 
50k
5079070 ProdMid 
195K
5079072 ProdLow 
23K
Marked questionable
5079075 ProdLow 
1K
5079077 PMD pedestal 
1K
5079079 ProdLow 
96K
PMD back now.
5079080 ProdLow 
3K
5079081 ProdLow 
3K
March20,2004 5080005 PMD pedestal
5080006 ProdHigh 
200K
5080008 ProdMid 
200K
5080009 ProdLow 
200K
5080010 ProdLow 
172K
5080012 ProdLow 
200K
5080013 ProdLow 
193K
5080014 ProdLow 
194K
5080017 ProdLow 
98K
5080026 PMD pedestal HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5080027 ProdHigh 
96K
5080028 Prodhigh 
23K
5080029 ProdHigh 
3K
5080031 ProdMid 
195k
5080032 ProdLow 
194K
5080033 ProdLow 
97K
5080035 ProdLow 
90K
5080041 PMD pedestal 
1K
HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5080042 ProdHigh 
200K
5080044 ProdHigh 
54K
5080045 ProdHigh 
53K
marked questionable by shift leader.
5080047 ProdMid 
130K
5080048 ProdLow 
74K
5080049 ProdLow 
6K
DAQ rebooted for all  it seems.
5080050 ProdLow 
194K
5080051 ProdLow 
191K
5080056 PMD pedestal 
1K
HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5080057 ProdHigh 
71K
5080059 ProdHigh 
85k
5080060 ProdHigh 
40K
5080062 ProdMid 
7K
5080063 ProdMid 
197K
March21,2004 5081001 ProdLow 
200K
5081003 ProdLow 
2K
5081010 PMD pedestal 
1K
same HV conditions as above.
5081011 ProdHigh 
40K
5081012 ProdHigh 
28K
5081013 ProdHigh 
39K
5081014 ProdHigh 
22K
5081015 ProdMid 
103K
5081016 ProdMid 
170K
5081018 ProdLow 
200K
5081019 ProdLow 
18K
5081030 PMD pedestal HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5081031 ProdHigh 
3K
5081032 ProdHigh 
165K
5081034 ProdLow 
179K
5081035 ProdLow 
42K
5081036 ProdLow 
50evts
5081044 ProdLow 
45K
5081052 PMD pedestal 
1K
HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5081053 ProdHigh 
96K
5081055 ProdMid 
21K
5081056 ProdMid 
8K
5081057 ProdLow 
97K
5081058 ProdLow 
97K
5081059 ProdLow 
115k
5081061 ProdLow 
194K
5081062 ProdLow 
115k
5081064 ProdLow 
15k
5081066 PMD pedestal 
1K
HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5081067 ProdLow 
97K
5081068 ProdLow 
6K
5081076 PMD pedestal 
1k
HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5081078 ProdHigh 
97K
5081081 ProdHigh 
23K
5081082 ProdMid 
194K
5081083 ProdLow 
63k
5081084 ProdLow 
171K
5081085 ProdLow 
118K
March22,2004 5082014 PMD pedestal 
1K
HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5082015 ProdHigh 
158K
5082016 ProdMid 
200K
5082018 ProdLow 
200K
5082020 ProdLow 
97K
8:17AM 5082021 ProdLow 
46K
5082034 PMD pedestal 
1K
HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5082035 ProdHigh 
49K
5082037 ProdHigh 
41K
5082040 ProdMid 
131K
5082050 PMD pedestal 
1K
HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5082051 ProdHigh 
76K
5082052 ProdHigh 
56K
5082053 ProdMid 
17K
5082056 ProdLow 
20K
March23,2004 5083010 PMD pedestal 
1K
HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
5083011 ProdHigh 
97K
5083012 ProdHigh 
37K
5083013 ProdMid 
59K
5083015 ProdMid 
75evts
FTPC 100% dead.
5083016 ProdMid 
96K
5083021 ProdLow 
140K
5083023 ProdLow 
100evts
5083024 ProdLow 
24K
5083031 PMD pedestal 
1K
HV conditions same as above. SM  20 OFF, and ALL SMs in PMD plane -1400V except SM 24 which is at -1200V
March24,2004
5084006 PMD pedestal peds run. not successful, always giving error in DAQ saying, pmd01.daq.bnl.local/pmd and pmd02.daq.bnl.local/pmd rebooting by itself. Runs stopped automatically. 

            6:32AM                                                                       - Subasis Chattopdhyay 

12.25PM 5084038 PMD pedestal 
1K
BEAM OFF PED TAKEN TO SEE WHETHER DAQ IS OK OR NOT. 
SEEMS OK .

THE 62GEV RUN RAMP SEEMS TO HAVE STARTED, SOME MORE BEAM TUNING IS REQUIRED.
 
 
date and time run No what sort of run? comments 
March25,2004 5085015 PMD pedestal
1K 
HV conditions same as above. SM  20 OFF, and ALL other SMs in PMD plane -1400V except SM 24 which is at -1200V. 
(THIS HV conditions IS SAME THROUGHOUT 
UNLESS OTHER WISE MENTIONED)
5085017 production62GeV
19K
PMD is now in PANITKIN PLOTS from this run
There are 8 pages of 6 chains each, CPV 1st
4 pages and then the rest pages PMD.
5085018 production62GeV 
194K
5085020 production62GeV 
194K
5085022 production62GeV 
170K
5085025 production62GeV 
187K
GAS BOTTLE CHANGED on 25th Night SHIFT by  Subhasis the Shift Leader(time 1.00PM)
March26,2004 5086007 PMD pedestal 
1K
5086008 production62GeV 
97K
5086009 production62GeV 
194K
5086014 production62GeV 
163K
5086016 production62GeV 
44K
5086036 PMD pedestal 
1K
5086037 production62GeV 
16K
5086038 production62GeV 
252K
5086039 production62GeV 
135K
5086040 production62GeV 
114K
5086043 production62GeV 
115K
5086044 production62GeV 
20K
5086046 production62GeV 
134K
5086047 production62gev 
149K
5086069 PMD pedestal 
1K
Here RMS looks ok ~1.5
5086071 production62GeV 
1K
Marked questionable by shift leader
5086072 production62GeV 
193K
5086073 production62GeV 
149K
March27,2004 5087003 PMD pedestal 
1K
5087005 production62GeV 
193K
5087007 production62GeV 
142K
5087008 production62GeV 
1K
5087014 PMD pedestal BAD run DO NOT CONSIDER
5087015 PMD pedestal 
1K
OK now!
5087022 PMD pedestal 
1K
5087023 production62GeV 
194K
5087025 production62GeV 
193K
SM -22 tripped during this run
5087026 production62GeV 
74K
5087042 PMD pedestal 
1K
This pedestal is also questionable !!!
Later checked from EVP and found OK. rms ~2
5087044 production62GeV 
32K
5087045 production62GeV 
8K
5087057 PMD pedestal 
1K
This pedestal is also questionable !!!
Later checked from EVP and found OK . rms ~2 
5087058 production62GeV 
193K
5087060 production62GeV 
190K
5087061 production62GeV 
2K
5087067 PMD pedestal 
1K
This PED WAS BEAM OFF as said by shift leader , but run control says beam was there still inside.
5087068 PMD pedestal 
1K
BEAM ON PED LOADED
5087073 production62GeV 
193K
5087075 production62GeV 
146K
5087076 production62GeV 
103K
5087078 production62GeV 
700evts
March28,2004 5088002 PMD pedestal 
1K
       BEAM OFF PEDESTAL
5088006 PMD pedestal 
1K
5088007 production62GeV 
99K
5088010 production62GeV 
193K
5088012 production62GeV 
193K
5088026 PMD pedestal 
193K
5088027 production62GeV 
193K
5088029 production62GeV 
193K
5088030 production62GeV 
193K
5088031 production62GeV 
140K
5088044 PMD pedestal 
1K
5088046 production62GeV 
193K
5088048 production62GeV 
193K
5088049 production62GeV 
193K
5088050 production62GeV 
194K
5088059 PMD pedestal
5088060 production62GeV 
193K
5088062 production62GeV 
74K
5088070 PMD pedestal 
1K
       BEAM OFF PEDESTAL
March29,2004 5089005 PMD pedestal 
1K
5089006 production62GeV 
69K
5089007 production62GeV 
7K
5089008 production62GeV 
87K
5089021 PMD pedestal 
1K
5089022 production62GeV 
1 event
5089023 production62GeV 
50K
5089024 production62GeV 
190K
5089027 production62GeV 
25K
5089028 production62GeV 
30K
5089033 PMD pedestal 
1K
5089035 production62GeV 
1K
5089036 production62GeV 
115K
5089045 PMD pedestal 
1K
5089048 production62GeV
5089050 production62GeV
5089058 PMD pedestal BAD RUN CRASH(DAQ ERRORS)
5089059 PMD pedestal BAD RUN CRASH(DAQ ERRORS)
5089060 PMD pedestal 
1K
 BEAM OFF PED TAKEN 
TO  CHECK DAQ ERRORS
5089065 PMD pedestal 
1K
BEAM ON PED NOW
5089066 production62GeV 
193K
5089067 production62GeV 
193K
5089069 production62GeV 
145K
5089070 production62GeV 
117K
March30,2004 5090008 PMD pedestal 
1K
Pedestal Ok rms~2 even though
marked questionable
5090009 production62GeV 
193K
5090012 production62GeV 
111K
5090025 PMD pedestal 
1K
5090029 production62GeV 
193K
5090032 production62GeV 
387K
5090038 production62GeV 
9K
5090057 PMD pedestal 
1K
5090058 production62GeV 
18K
5090059 production62GeV 
90K
5090060 production62GeV 
95K
5090062 PMD pedestal 
1K
BAD PEDESTAL RUN
5090064 production62GeV 
36K
5090066 production62GeV 
0 events
5090069 production62GeV 
130 events
Marked questionable by shift leader
March31,2004 5091002 PMD pedestal 
1K
OK rms ~ 2
5091003 production62GeV 
193K
5091005 production62GeV 
83K
5091006 production62GeV 
70K
5091007 production62GeV
466evts
Marked questionable by shift leader
5091025 PMD pedestal 
1K
5091026 production62GeV 
193K
5091028 production62GeV 
105K
5091031 production62GeV 
146K
5091032 production62GeV
34K(run crash)
5091033 production62GeV
39K
5091049 PMD pedestal 
1K
OK  BEAM OFF PEDESTAL TAKEN for DAQ CHECK as suggested by shift leader.
But it seems fill was there still inside as checked later from run control.
5091050 PMD pedestal 
1K
NOW BEAM ON PED.
5091051 production62GeV
1event
BAD RUN
5091052 production62GeV
104K(run crash)
5091053 production62GeV
0 events
False start seems.
5091055 production62GeV
0 events
BAD RUN
5091056 production62GeV
1246 events
5091060 production62GeV
0 events
BAD RUN
5091061 production62GeV
34K
5091063 production62GeV
78K(run crash)
5091065 production62GeV
80K
5091066 production62GeV
38K
5091102 PMD pedestal 
1K
BEAM ON PEDS

 April 1,2004
5092019 PMD pedestal 
1K
OK BEAM ON PEDS.
5092020 production62GeV
196K
5092023 production62GeV
7K
5092024 production62GeV
148k
5092032 PMD pedestal 
1K
5092033 production62GeV
20K
5092034 production62GeV
178K
5092036 production62GeV
195K
5092037 production62GeV
104K
April 2,2004 5093053 PMD pedestal 
1K
BEAM OFF PEDESTAL

THIS IS THE END OF 63GEV RUN AND NOW RHIC
IS PREPARING FOR PP COLLISIONS.
 
Date Run Number What sort of run? Magnet Field and other
status?
comments
April 5,2004

1st DAY of
ACCESS

WE (Subhasis and Debasish) HAD ACCESS AND WE WORKED ON THE BAD CHAINS OF THE PMD PLANE(NORTH SIDE).

We got lift and place to work at around 3:30PM after pole tip was retracted.

 We had a list of bad chains from last pedsetsla run during data taking (63 GeV).
So we wanted to fix them The list was impressive (25,35,36,27,32,30).

Before taking them we checked LVs on buffer board end for good chains to have some idea how they look like.

After that we followed vanilla procedure of removing boards and see if DB still holds.

for 25 >5 boarsd are removed to satisfy that. We are not sure if they are all bad voards, doubt is DB current limit is too low, and slight 'bad' also makes 'BAD'.

ALL bad chains are fixed except 33. (33 was not in bad chain list, but we see very low 
peds on scope and nothing on daq for that chain).

chain 37 was connected to CPV side DB, when we connect that to one channel of Preshower side DB, it worked fine. We chnged the slots in CPV side DB, no where it took. Bad DB? too low current limit.

 We did not want to play with DB.

We were in a dilemma whether to replace the bad boards with new ones, and sort of decided
 if those  new ones go bad in pp run, where we are not sure how much data we will take!!!

Chain 37 was finally connected to one of the preshower side DB taking the slot of chain 25 (i.e removing 25). this was done after thinking that 25 is in the outer circle,
37 is inside, for PMD taken apart, 25 will have more chance to be shadowed by magnet.

So, that's all for today. Will try to work on south side tomorrow.

April 6,2004

2nd DAY of
ACCESS


 

5097056
5097057
5097058


 

-->BAD RUN
PEDESTAL
PEDESTAL
(1K evts)


 
 

Zero Field 
of STAR magnet.

TODAY WE DEBUGGED THE SOUTH SIDE OF PMD PLANE.
We took a pedestal (at 0V) in WAH and started to work.Today we debugged the chains from 39 to 48. We removed the 46th chain. The other chains which we could not debug was 33 and 35. The rest are OK.

 Debasish was on shift and a  pedestal was taken at -1400V except SM 20 OFF , SM-24 at -1200V.(7PM)Now another pedestal taken and it seems that there is some STAR trigger problem . The peds dont look OK.
 Debasish discussed with Shift Leader Richard Majka and he also feels that Triggers guys are working 
on STAR Trigger. After taking peds HV is ramped down to standby.

April 7,2004

3rd DAY of
ACCESS


 
 
 
 

5098105

5098107


 
 
 
 

PEDESTAL

PEDESTAL
(1K evts)


Polarity B (Reversed) Full Field of 
STAR magnet.

-->BAD RUN

RUN OK.
but taken without 
SCALARS.
 

TODAY we dont have lift and SO we took PEDESTAL( at 0V) once again in WAH.
We found that chain-30 OFF which we had debugged earlier on 5th April. So Subhasis went up in the late evening after we had lift from BBC guys and removed board-19 . Now chain-30 is OK. Now the final status that chains 25, 46, 47 and 48 are not connected. The chains 33 and 35 we wanted to debug but could not as BBC guys need LIFT and thats all for ACCESS.

THE SCALERS are yet not fixed by Trigger guys and  So pmd pedestal taken with SCALARS out
as there was no other option . The Shift leader Richard Majka also suggested the same to debasish.
Later reconfirmed with Tonko's mail:

Subject:
        scaler 1 dead... 

    From:
        "Tonko A. Ljubicic" <tonko@bnl.gov> 
    Date:
        Tue, April 13, 2004 1:03 pm 
     To:
        startrig-hn@connery.star.bnl.gov 
  Priority: 
        Normal 
 
 

  The first scaler board is dead again. It issues bus errors and does not
  work. This occassionally stops the whole SCALER system.

   -- Tonko

The Voltages were same at before. ramped all working SMs to PHYSICS mode and then put them all
to standby after taking pedestals. LV also OFF after taking pedestals.
 

April 8,2004 5099002
5099003
PEDESTAL
PEDESTAL
(1K evts)
Polarity B (Reversed) Full Field
 
the pedestals are OK.the rms of working chains are 1.4 except  chain 27 show some spikes and has
rms 2-6.
April 9,2004 5100001 PEDESTAL
(1K evts)
-do- OK the peds look same as yesterday. Left overnight after discussion with Subhasis at -1400V.
The LV was off and also informed the Star Shift Crew to inform and write in Log book is any SM 
of PMD trips.
April 10,2004 5101002 
to 5101006
are BAD runs.

5101007

5101008
 
 
 
 
 
 

5101017


 
 

PEDESTAL
(1K evts)
PEDESTAL
(1K)
 
 
 
 
 

PEDESTAL
(1K)
 


-do-
Helen Caines the Shift Leader of morning shift and debasish tried to debug trigger and rebooted STAR trigger 2 times before taking PMD pedestal. Still scalars are out in PEDESTAL run.

The Chains in pedestal from 26 to 33 show OFF and LV connections for those chains show 0 Amps.
Subhasis , debasish and Rashmi discussed and suspected some LV OFF due to over current.

Same status and no improvement. All those chains STILL SHOW OFF!!!.

So Subhasis suggested to make HV of PMD plane to 0V as we could not understand and did not want to lose any more chains.

So after the PEDESTAL RUN #5101008 THE PMD IS PUT TO 0V and PEDESTAL TAKEN with 0V condition just to check the health of the chains from time to time.
 

rashmi and debasish took pedestals once again in evening and found chains OK NOW!!!!!!
This seems that the LV which had gone OFF due to over current are BACK.
But this surge of over Current did cost us and chains additionally bad now are
27, 30,31 and 44.
But still we are relived so see most BACK and pedestal taken at 0V.
 
 
 
 
 

April 11,2004 5102009 PEDESTAL
(1K evts)
-do- The pedestals are same as before and now no more chains going bad. However after there was a RF problem and Helen Caines reported a Controlled Access . Subhasis went inside to see the LV state.
He reported that they are ON and BACK to life which is reconfirmed from the pedestal status.
 The pedestal taken and PMD still in 0V .
April 12,2004 5103005 PEDESTAL
(1K evts)
-do- OK same as yesterday, no new chains going bad.
April 13,2004 5104015 PEDESTAL
(1K evts)
-do- OK same as yesterday and no new bad report .
April 14,2004 The TRIGGER people are working now and so rashmi & debasish could not take PMD pedestals.
http://www.star.bnl.gov/HyperNews-star/get/startrig/2603.html
April 15,2004 The mail shows that people are working on Trigger which IS PRIME CONERN. 
http://www.star.bnl.gov/HyperNews-star/get/starops/1523.html
April 16,2004 http://www.star.bnl.gov/HyperNews-star/get/starops/1524.html
http://www.star.bnl.gov/HyperNews-star/get/startrig/2605.html
April 17,2004 http://www.star.bnl.gov/HyperNews-star/get/startrig/2605/2/1.html
http://www.star.bnl.gov/HyperNews-star/get/startrig/2606.html
April 18,2004 5109042 PEDESTAL
(1K evts)
-do- rashmi and debasish took a PMD pedestal with 0V.
The chains rms seems OK ~1.4. We compared and found no new bad chains. Now waiting if all
goes OK till we get some events in PP. The trigger work for PP still continues..........
April 19,2004 5110034

5110035

5110036

5110037

PEDESTAL
(1K evts)
-do-

-do-

-do-

-do-

Pedestal with -1400V(rms was high~2.5)

Pedestal with -1400V(rms~1.4)

Pedestal with -1400V(rms~1.4)

Pedestal at 0V after ramping down the HV(rms~1.4)

April 20,2004 Still Trigger tests continues and no Pedestals can be taken with PMD. Also today Les and others were tuning the triggers in the evening fill. But still the polarization tests were yet to be done. The bunches yellow and blue were synchronized as per  requirements ,as to which bunch pair interacts at STAR.
April 21,2004 Still Trigger tests continues and no Pedestals can be taken with PMD. 
April 22,2004 Still Trigger tests continues and no Pedestals can be taken with PMD. 
April 23,2004 5114016
 

5114019
 

5114023 
 
 
 
 

5114024
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

5114025
 
 
 
 

5114026
 
 

5114027
 

5114028

PMD pedestal
(1K evts)

PPminbias
Physics

Pmd Test
Physics
(with TPC)
(99K)
 

Pmd Test
Physics
(with TPC)
(99K)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

PP Physics
(13K)
tpc emc pmd eemc bsmd esmd

PP physics
(29K)-do-
 

PP physics
(9K)-do-

PP physics
(26K)-do-

-do-
 

-do-
 

-do-
 
 
 
 

-do-
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

-do-
 
 
 
 

-do-
 
 

-do-
 

-do-

PMD HV is put upto -1400V and BEAM ON PEDESTAL TAKEN
and so HV remains -1400V till all PMD PP runs end.

Improper Trigger as Pre-Trigger is not set properly according to Les Bland.

This is the TRIGGER DETAILS OF Pmd TEST TRIGGER from Les Bland:

The east(west) BBC is a scintillator annulus tiled by hexagons.  The
 annulus covers pseudorapidity values 3.3 < |\eta| < 5.0 with full 2\pi
 azimuthal coverage.  The east(west) detectors are mounted on the outside
 of the magnet poletip at a distance of 3.74m from the interaction point. 
 There are a total of 18 hexagons in two rings in \eta.  Scintillation
 light is collected by 16 photomultiplier tubes.  A schematic drawing
 showing the BBC from a perspective outside of the STAR magnet looking
 towards the interaction point is available at
 http://www.star.bnl.gov/STAR/html/bbc_l/fy03/bbc_run3.ps The detector used
 in run 4 is identical to the one used in run 3.

 The BBC phototube currents are input to analog-to-digital converters
 (ADC).  With the typical operating voltages on the phototubes, a minimum
 ionizing particle produces a most probable ADC value of ~15 counts.  In
 addition to ADC data, when the phototube current pulse exceeds a 0.6 mA
 threshold, a time-to-amplitude converter (TAC) is started.  Each
 phototube's TAC is stopped by the RHIC clock, and the TAC current is input
 to an ADC.  The trigger algorithm that converts the charge and timing data
 into a minimum bias trigger is available at
 http://www.star.bnl.gov/STAR/html/trg_l/run2003/BBC.pdf

 For p+p minimum bias events, the trigger is a coincidence between the east
 and west BBC small scintillator tiles.  The trigger requires
    . the summed charge from the east(west) small tiles must exceed
      10 ADC counts.
    . the channel that defines the timing for east(west) small tiles
      must have 25 < TAC_ADC < 180
    . the east/west time difference (proportional to the z position of the
      collision vertex) must be 166 < TAC diff < 346.

 The total cross section of the p+p minimum bias trigger has been measured
 by the vernier scan technique (steering one beam across the other to
 measure the horizontal and vertical beam size) to be 26.1 +/- 0.2(stat)
 +/- 1.8(syst) mb.  It is referred to in many STAR papers (see, for example
 hep-ex/0310058)

 For run 5114023, the trigger used was similar to the p+p minimum bias
 trigger, except that the summed charge from the east small tiles of the
 BBC must exceed 150 ADC counts.  This more stringent requirement
 is imposed so that the PMD pretrigger (>7 hit phototubes from BBC east and
 BBC west) is efficient.

THESE runs have PMD in but DO not HAVE the PMD TEST TRIGGER WHICH
IS SPECIAL FOR PMD so MAY NOT BE USEFUL FOR ANALYSIS.
 
 
 
 
 
 
 
 
 
 
 
 
 

After this PMD Gas bottle was changed as it was finished and HV ramped down to 0V.
LV also PUT OFF.

April 24,2004 PMD HV AND LV OFF
April 25,2004 PMD HV AND LV OFF
April 26,2004 PMD HV AND LV OFF
April 27,2004 PMD carbon dioxide gas bottle PUT OFF . Argon flow will continue as it is.
April 28,2004 PMD HV AND LV OFF