Requirement:
The ON-line SVT software includes a user interface to allow the SVT operator to establish the configuration of the SVT receiver cards, down load the ASICs, down load the trigger software, start or setup the calibration and monitoring processes, to start and setup the event display as well as the on-line analysis software.
Justification:
It should be possible to establish the configuration of the entire SVT subsystem from a single entry point.
Requirement:
The configuration of the SVT subsystem should be modular, ``data driven'' and proceed from ``configuration lists''.
Justification:
It is thus easier to start and recover the system after shut down. The modularity ensures a good capacity for growth in functionality.
Requirement:
The SVT subsystem control system uses a graphical interface.
Justification:
Justification of the requirement
Requirement:
The SVT subsystem control user interface includes a window to display the state and status of the SVT subsystem.
Justification:
Justification of requirement
Requirement:
Justification of the requirement
The SVT subsystem control user interface includes a window to select the ASICs parameters and configuration.
Requirement:
The SVT subsystem control user interface includes a window to setup and select the I960 software and configuration.
Justification:
Justification of the requirement
Requirement:
SVT subsystem control user interface includes a window to setup and select the level 3 trigger software and configuration.
Justification:
Justification of the requirement
Requirement:
The SVT subsystem control user interface includes a window to display help on the various components of the subsystem.
Justification:
Justification of the requirement
Requirement:
The SVT subsystem control user interface includes a log window.
Justification:
Justification of the requirement
Requirement:
The SVT subsystem control user interface includes software for messaging and communication with STAR Experiment and STAR Run control.
Justification:
Justification of the requirement