Up: Starting Run Control
Synchronizing MiniDAQ and Slow Controls
Refer to the State Model Diagram to see
the relation of the current MiniDAQ and Slow Controls states.
-
From Run Control's menu bar, bring up the separate MDAQ and SC control
windows.
-
If one is in the run state, b>end the run gracefully.
-
If one is in the ConfigErr or PrepErr states,
try to recover gracefully with a configrecover and configure,
or a preprecover and getset, respectively.
-
If both are beyond the Connected state, move them to the
same state, following the
State Model Diagram.
-
Otherwise, it is usually simplest to abort one or both, moving
to the Aborted state; when both are Aborted or Connected,
procede with an init, etc.
Page maintenance:
Roy Bossingham, LBNL
RRBossingham@lbl.gov