Trigger DAQ Interface (working) document (This file is in .ps format)
Trigger Clock Distribution (working) document (This file is in .ps format)
VME Information
STAR Trigger VME Board Base Address List (This file is in .pdf format)
Level 1 Simulation Results (1995)
Level 2 Simulation Results (1995)
Level 3 Simulation Results (1995)
Level 4 Simulation Results (1995)
Misc. Simulation Results (1995)
Trigger System Test 1999 Document
(pdf version
Trigger System Test 1999 Schematic
(pdf version)
STAR Trigger System Test 1999 Crate Layout
(pdf version)
Steps to Completing the Trigger System Test 1999
(pdf version)
1999 System Test Cable Map (Crate #3) (This file is in .pdf format)
PWG requests for 2004 trigger workshop (26Sep03)
ZDC Plots (30Aug01)
CTB Pedestals (28Aug01)
Trigger Talk at the DNP2000 Meeting (09-28-00)
Trigger Documentation System Proposal (11-19-98)
(pdf version)
Example of a Trigger Mix for a STAR Run (8-10-98)
STAR Calibration Events (8-20-98)
Status of TRG STAF Modules (9-18-97)
Year One Au-Au and Beam-Gas Rates (5-13-97)
Simulation Plan (11-19-96)
Level 1 Dimension Lowering (9-13-95)
Luminosity (12-14-94)
Proposed QM2001 Trigger Poster
Timing in the STAR Trigger (This file is in .pdf format)
STAR Trigger Timing Blocks (This file is in .pdf format)
VME to PCI Bus Manual (This file is in .pdf format)