Endcap Calorimeter Prototype 
  
 
 
This is a view of the FFTB corridor looking upstream. The upstream drift space is immediately to the left (out of view) in the picture. The electronics racks for T-438 can be mounted on the outside of the large diameter pipe, leaving suitable space for egress.  
 
 
Slide 3 of 12