TOFp System Procedure:
TOFr NPS All On


   Description:
This is the procedure to turn on all plugs of the TOFr NPS that are necessary for physics running. Follow this procedure after loss (and restoration) of AC power on the platforms or loss of the SGIS Global Permissive.
   Related Documentation:
  1. TOFp Glossary
  2. TOFr NPS Tutorial
   Requirements:
  1. Notification of TOFp Group.
  2. Access to STAR Subnet.
  3. Password Information (posted at TOF Station in STAR Control Room).
   Procedure:
  1. Open the TOFr NPS Tutorial in a browser window for reference.
  2. From any terminal window, make a telnet or ssh connection to tofrnps.starp.bnl.gov  (130.199.60.9). The password is posted at the TOF Station in the Control Room.
  3. You are now logged into the TOFr Network Power Switch.
  4. Enter
         /S
    to display NPS Plug names and status.
  5. Enter exactly as shown below
         /on 1:5,y
    to turn on NPS Plugs 1 through 5.
  6. Enter exactly as shown below
         /on 7:8,y
    to turn on NPS Plugs 7 through 8.
  7. Enter
         /S
    to display NPS Plug names and status.
  8. Make sure all plugs except #6 are on...
  9. Enter /x,y to exit the communication w/ the NPS unit.
  10. Note the action in the Shift Log Book.
   Testing:
N/A
   Completion:
  1. Contact TOFp Control to inform that procedure is complete, and with any end-of-procedure comments that are necessary.
    Was this procedure successful? Is this documenation understandable and complete?