Calibration Runs Run 5063103 Pedestal Run 5063104 2 MOhm in IFC east (normal) Run 5063105 2 Mohm in IFC west Run 5063106 2 Mohm back in IFC east That was email from Blair on March 4, 2004. _________________________ There was also: January 22, 2004: Magnet on, B polarity No beam in RHIC Local clock All laser beams Gated grid was varied on both east and west Run 5022005 Pedestal Run 5022006 GG = - 115 (Nominal) Run 5022007 GG = -140 Run 5022008 GG = -165 Run 5022009 GG = - 90 Run 5022010 GG = -65 For the last run 4 outer, 8 outer, 22 outer, 24 outer and 14,15 inner had a yellow alarm I looked at each and they were at ~ 63 volts. According to Geno, that difference shouldn't be noticeable. ________________ Set 2 was taken at ~20040122.164000 GMT DB has altered GG values for these. Set 1 was taken at ~20040303.213000 GMT DB does not have altered field cage short values for these. |