From: W.J. Llope (llope_at_hbar.rice.edu)
Date: Sat Jan 18 2003 - 21:10:51 EST
whoops - dave's not on shift at the moment... i'll contact
the control room etc... soorry
On Sat, 18 Jan 2003, W.J. Llope wrote:
>
> hi all
>
> all tofp systems are now powered up. tofp hv and tofr hv is on,
> pvpd on/off is under shift crew control w/ the same basic
> procedure as last run (off unless cogged beams)...
>
> seems we're ready to be included in runs.... dave?
>
> any questions just contac tus (tofp_at_physics.rice.edu)...
>
> good luck! thanks
>
>
>
>
>
>
>
>
>
>
> On Sat, 18 Jan 2003, Frank Geurts wrote:
>
> > thanks Dave ... i checked the data ... tofp pedestal data looks good.
> > This basically means that i am signing off on this and as far as i'm
> > concerned tofp can be part of the star runcontrol.
> >
> > cheers,
> > -frank
> >
> >
> >
> >
> > David Hardtke wrote:
> > >
> > > 4018026 -- tof pedestals on disk
> > >
> >
> >
>
>
-- _________________________________________________________ W.J. Llope, Ph.D. Res. Assoc. Professor http://wjllope.rice.edu/default.html llope_at_physics.rice.edu T.W. Bonner Nuclear Lab. Rice University, MS-315 6100 S. Main phone: 713-348-4741 Houston, TX 77005-1892 fax: 713-348-5215
This archive was generated by hypermail 2.1.4 : Thu Jul 24 2003 - 00:39:31 EDT