To Do List
List of urgent things to do (without any priority order). Finished tasks are strikethrough. Started tasks are in red.
Update the SSD geant geometry
- Update the big sector supports
- Update the SSD on the cone supports
- Update some ladder radii (by 2 mm)
- Update the wafer locations (increase the distance between adjacent wafers by 0.5mm)
- Update the HV decoupling capacitance description (size and material)
Study the simulations versus the real data
- Use the real calibration file to generate simulation hits in the SSD
- Merge the reconstruction codes for simulations and real data (StSsdPointMaker and StSsdClusterMaker)
Include the hybrid defects in the data readout
- Include the chip bypass in the data readout
- Include the TAB defects in the data readout
Understand the one strip offset for some ladders in the SsdDaqMaker
Insert and read the calibration runs from the mysql db
- Insert and read the full calibration files for the 4 selected runs
- Produce lighter calibration files based on pedestal and rms significant changes
- Insert the lighter calibration files
Finalize the global alignment
- Finish the fine ladder alignment
- Study the 62 FF versus the 200 NF data
- Study the TPC versus the TPC+SVT data
Document the ladder assembly and sector surveys
- Systematic on the ladder assembly survey
- Systematic on the sector assembly survey
- New position tables from the survey data
Include the relative gain calibration
Lilian MARTIN