Gallery Area:

1: BNL Lab

pic101 Long MRPC supports pic102 Signal Pigtail Connecting pic103 MRPC box covering  
pic104 A View of Raw Tray Box pic105 FEE & DC Cable Connected pic106 Let's Snap After Assembling
pic107 Preparing for T963 Trays pic108 Tray Boxes Airproof Checking pic109 Cosmic Telescope Running
pic110 A View of the Full Settings    
     

2: T963 Facilities

pic201 MT6, Meson Test Beam Site pic202 Storage Area Inside MT6 pic203 Radiation Control Access Gate  
pic204 T963 Gas System pic205 Gas Flowing & Mixing Meter pic206 Gas Main Control Interface
pic207 Cable Connectors pic208 MT6-2A Facilities Layout pic209 TOF2 in MT6-2D
pic210 MWPC-1A-1B pic211 MWPC-1A Upwards 45 Degree pic212 MWPC-1B
pic213 MWPC-2A-2B pic214 MWPC-2A 45 Degree pic215 MWPC-2B
pic216 MWPC-3A-4A pic217 MWPC-3A 45 Degree pic218 MWPC-3B
pic219 MWPC-4A 45 Degree pic220 MWPC-4B pic221 MWPC-5A
pic222 Gas Sources Cabin pic223 Beam Status Monitor  
     

3: T963 Installations & Running

pic301 MPRCs High Voltage pic302 Cabling On April 29th pic303 DAQ Event Monitor  
pic304 HV Dark Current Monitoring pic305 T963 DAQ Room pic306 Gas Main Control Interface
pic307 Tilted by 30 Degree pic308 MT6-2A Facilities Layout pic309 Full Screen in MT6-2C/D
pic310 T963 Detector Family No.s pic311 3 GEMs Side by Side pic312 3 GEMs Side by Side
pic313 GEMs Gas Pipelines pic314 GEMs Gas Pipelines pic315 Caution, GEMs' HV Applied
pic316 Control Front Desk pic317 Control Front Desk pic318 GEM Footmarks
pic319 GEMs Close to TOF2 pic320 GEM Box No. 1 pic321 Middle GEM Box, Titled
pic322 GEM Chamber Frontface pic323 HV Power Close-up pic324 One of Minus HV tripped
pic325 Data Backup from Station pic326 During Data Taking  
     

4: People Laboring

pic401 Setting Up, April 29th pic402 Cabling In, April 30th pic403 After Airproofing, May 1st  
pic404 Before the 1st Spill, May 2nd pic405 Data Taking, May 12th pic406 News from Analysis, May 12th
pic407 Efficient Cooperation, May 12    
     

Click here to the gallery folder.