The space requirements for integrating the SVT subsystem are detailed
in this section. NOT discussed is the space required for the 24 READOUT
ELECTRONICS locations and the space required for the SVT and its physical
support structure.
Space is required for the following SVT subsystem interconnections:
-
Electrical CABLES from the SVT RACKS to the SVT
READOUT ELECTRONICS or passed through the READOUT ELECTRONICS to the
SVT CARRIERS OR CARRIER INTERFACES
-
Electrical CABLES from the SVT READOUT ELECTRONICS to the
SVT CARRIER INTERFACES
-
OPTICAL FIBERS from the SVT READOUT ELECTRONICS to
the COUNTING HOUSE (DATA ACQUISITION)
-
WATER LINES to the SVT WATER MANIFOLDS
-
AIR DUCTS to the SVT LIGHT PLATES
-
RACK space for power supplies, TRIGGER distribution electronics,
CALIBRATION
electronics, SLOW CONTROLS, WATER system, etc.
-
OTHER space needs
For the discussion in this section: the RACKS location is
on the NORTH PLATFORM, SECOND LEVEL;
the READOUT ELECTRONICS locations are
on the TPC endcaps near the
ends of the SVT SUPPORT CONES; the
CARRIERS and CARRIER INTERFACES are located near
each end of the SVT; and CABLE refers to either a single conductor
cable or a multiconductor cable.