Analysis of EJP1 runs from April 19
Input = fraction of run 6109018, all 14K events.
trig type | Trig ID | nEve accepted
|
ETJP1 (DSM thr=63) | 10 | 794
|
ETJP1 triggered events
more Pplot spectra
EEMC Jet Patch QA plots
EJP threshold bug fix result:
plot: X=phiBin, Y=etaBin, Z=rate per tower. Four plots are for Tower, pres1, pres2, post-shower tiles.