Navigation bar
  Print document Start Previous page
 3 of 3 
Next page End  

2.
Data Taking Mode :
(i)
CPV plane : Go to workspace 1 again and now
press                     and then go to work space 2 
to change the voltage of PMD plane for each
channel.
For more information
about changing the HV of PMD, please refer to
section A of the Operation Manual.
(ii)
Now go back to work space 1 to again ensure
the plane has been set at 1400V by reading the
message “Operating Voltage Set=>Successful”.
Now come back to workspace 2 to again ensure
that PMD plane is set at 1400V by seeing that
status display.
(iii)
Now take data run from run control with
configuration file “for Run7”.
PHYSICS
3.
Gas System :
In every shift, Gas operator
should check the PMD Gas scale
for Co2 and Ar as indicated.
http://www.purepage.com