Newsline:

May/03/2007 The very first offline result, Horizontal Beam Profile is plotted.  (Preliminary, Pic )
May/04/2007 Timing resolution, in which time unit is 50ps/CH, fitted by Gaussian from RUN 30. (Preliminary, Pic)
May/07/2007 Phase of 60Hz pulse, 1MHz clock reset by 60Hz. (Preliminary, Pic, Doc)
May/08/2007 MRPCs' timing difference, no slewing, from strip#1(RUN69) and #2(RUN65). (Preliminary, Pic1& Pic2)
May/08/2007 Correlation with GEMs, spacial resolution of MRPC is calculated. (Preliminary, Details)